Mansfield ISD | James L. Coble Middle School Pavement in Arlington, TX
1200 Ballwed Road, Arlington, TX, 76002
Mansfield ISD | James L. Coble Middle School Pavement is a renovation/alteration project at 1200 Ballwed Road, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $100K across about 1 sq ft.
- Estimated project value
- $100K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $100.00K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 7 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
2 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
213 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Mansfield ISD | James L. Coble Middle School Pavement
The Mansfield ISD | James L. Coble Middle School Pavement project is a renovation and alteration of the school's pavement located at 1200 Ballwed Road in Arlington, Texas. The filing lists the estimated cost at $100,000 and the square footage as 1 sq ft. Mansfield ISD is the owner and developer of record for this work, which is situated in Tarrant County. The project involves public funds and public land, marking it as a significant public infrastructure update within the district's portfolio.
MMA serves as the design firm of record for this pavement renovation. Ross A Thomas is the registered accessibility specialist associated with the filing. The project was registered with TDLR in May 2025, and plan review was completed in the same month. Construction was scheduled to begin in June 2025, with a planned completion date of December 2025. The scheduled build window for this project is 213 days, which is longer than the county median of 92 days for similar renovation and alteration filings in Tarrant County.
Project Status and Context
Although the filing indicates a completion date of December 2025, TDLR has not yet recorded a final inspection. Consequently, the current state of the site is not confirmed in the public record. The project's estimated cost of $100,000 is below the county median for its type, placing it in the bottom quarter of comparable Tarrant County filings. The median estimated cost for renovation and alteration projects in the county is $250,000, with a middle half ranging from $125,000 to $600,000.
Mansfield ISD has six other TDLR-registered projects totaling $19,256,399, including renovations at Legacy High School and Kenneth Davis Elementary School. The design firm, MMA, has worked on six other TDLR-registered projects totaling $2,125,000, including pavement renovations at other Mansfield ISD schools such as Anna May Daulton Elementary and Imogene Gideon Elementary. This pattern suggests a coordinated approach to infrastructure maintenance across the district's Arlington and Grand Prairie campuses.
The project is located in ZIP code 76002, an area with a population of about 32,990 according to U.S. Census ACS 2023 five-year estimates. The median household income in this area is $103,909, and the median owner-occupied home value is $307,100. Housing in this ZIP code is predominantly owner-occupied, with 10,030 housing units. The Tarrant County unemployment rate was 4.4 percent in August 2026, lower than a year earlier, reflecting the regional labor market conditions during the project's timeline.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76002 (Arlington)
One email per change. Unsubscribe in one click. Privacy.
Mansfield ISD | James L. Coble Middle School Pavement is a Renovation/Alteration project located at 1200 Ballwed Road, Arlington, TX 76002 in Arlington, Texas. The project has an estimated value of $100K covering 1 sq ft. Mansfield ISD is the property owner and MMA is the design firm of record. The project was registered with TDLR on May 30, 2025.
Frequently Asked Questions
What is the current status of the pavement project?
TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. Plan review completed in May 2025, and construction was scheduled to finish in December 2025.
Who is the owner and design firm?
Mansfield ISD is the owner and developer of record. MMA is the design firm of record, and Ross A Thomas is the registered accessibility specialist.
Where is the project located?
The project is at 1200 Ballwed Road, Arlington, TX 76002, in Tarrant County. It involves the pavement at James L. Coble Middle School.
Is the school open to the public?
The TDLR record covers construction status only and does not confirm business operations. TDLR has not yet recorded a final inspection, so the site's current state is unconfirmed.
How does the cost compare to other projects?
The $100,000 estimated cost is below the Tarrant County median of $250,000 for renovation and alteration filings, placing it in the bottom quarter of comparable projects.
What is Mansfield ISD | James L. Coble Middle School Pavement?
Mansfield ISD | James L. Coble Middle School Pavement is a renovation/alteration project at 1200 Ballwed Road in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Mansfield ISD | James L. Coble Middle School Pavement
Is Mansfield ISD | James L. Coble Middle School Pavement open in Arlington?
Mansfield ISD | James L. Coble Middle School Pavement was scheduled to finish construction in Dec 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Mansfield ISD | James L. Coble Middle School Pavement located?
Mansfield ISD | James L. Coble Middle School Pavement is located at 1200 Ballwed Road, Arlington, TX, 76002, in Tarrant County.
Who is the owner or developer of Mansfield ISD | James L. Coble Middle School Pavement?
Mansfield ISD is the property owner/developer of record for Mansfield ISD | James L. Coble Middle School Pavement, per its TDLR project registration.
Who is the architect or design firm for Mansfield ISD | James L. Coble Middle School Pavement?
MMA is the design firm of record for Mansfield ISD | James L. Coble Middle School Pavement, according to its TDLR filing.
How much does Mansfield ISD | James L. Coble Middle School Pavement cost and how big is it?
Mansfield ISD | James L. Coble Middle School Pavement has an estimated construction value of $100K and approximately 1 square feet (about $100.00K/sqft), based on its TDLR filing.
Scope of Work
Mansfield ISD | James L. Coble Middle School Pavement
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1200 Ballwed Road, Arlington, TX, 76002
Related Projects
Same Owner
$609.6M totalWatch all construction in 76002 (Arlington)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Arlington?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.