Project intelligenceTDLR TABS2025020608Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

First Floor Med-Surg Maintenance

1311 East General Cavazos Blvd, Kingsville, TX, 78363

Target date passed (Apr 2026)Review Complete

First Floor Med-Surg Maintenance is a renovation/alteration project at 1311 East General Cavazos Blvd, Kingsville, in Kleberg County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Apr 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.3M across about 9,515 sq ft.

Estimated project value
$2.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
9,515 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$239/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
10 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 5, 2025302 days across supplied datesApr 3, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    11 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    291 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78363 (Kingsville)

One email per change. Unsubscribe in one click. Privacy.

First Floor Med-Surg Maintenance is a Renovation/Alteration project located at 1311 East General Cavazos Blvd in Kingsville, Texas. The project has an estimated value of $2.3M covering 9,515 sq ft. CHRISTUS Health is the property owner and CLK Architects & Associates, Inc. is the design firm of record. The project was registered with TDLR on June 5, 2025.

Frequently Asked Questions

What is First Floor Med-Surg Maintenance?

First Floor Med-Surg Maintenance is a renovation/alteration project at 1311 East General Cavazos Blvd in Kingsville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Scope of work includes modifications to Clean Supply, Soiled Utility, Nourishment, Medication, Nurse Station, Staff Lounge, and Staff Toilet. Aesthetic upgrades to existing patient rooms & toilets, and new finishes to corridors.

Is First Floor Med-Surg Maintenance open in Kingsville?

First Floor Med-Surg Maintenance was scheduled to finish construction in Apr 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is First Floor Med-Surg Maintenance located?

First Floor Med-Surg Maintenance is located at 1311 East General Cavazos Blvd, Kingsville, TX, 78363, in Kleberg County.

Who is the owner or developer of First Floor Med-Surg Maintenance?

CHRISTUS Health is the property owner/developer of record for First Floor Med-Surg Maintenance, per its TDLR project registration.

Who is the architect or design firm for First Floor Med-Surg Maintenance?

CLK Architects & Associates, Inc. is the design firm of record for First Floor Med-Surg Maintenance, according to its TDLR filing.

How much does First Floor Med-Surg Maintenance cost and how big is it?

First Floor Med-Surg Maintenance has an estimated construction value of $2.3M and approximately 9,515 square feet (about $239/sqft), based on its TDLR filing.

Scope of Work

Scope of work includes modifications to Clean Supply, Soiled Utility, Nourishment, Medication, Nurse Station, Staff Lounge, and Staff Toilet. Aesthetic upgrades to existing patient rooms & toilets, and new finishes to corridors.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1311 East General Cavazos Blvd, Kingsville, TX, 78363

27.49135, -97.85168

Watch all construction in 78363 (Kingsville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Kingsville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.