Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
W Boydstun Avenue/Forest Trace in Rockwall, TX
S Lakeshore Dr. to SH 205 (S Goliad St.), Rockwall, TX, 75087
W Boydstun Avenue/Forest Trace is a renovation/alteration project at S Lakeshore Dr. to SH 205 (S Goliad St.), Rockwall, in Rockwall County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $547K across about 29,745 sq ft.
- Estimated project value
- $547K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 29,745 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $18/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 6mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
91 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
550 days after the preceding date shown.
Source: TDLR filing
View source record
📰About W Boydstun Avenue/Forest Trace
The W Boydstun Avenue/Forest Trace project involves the reconstruction of roadway infrastructure in Rockwall. The City of Rockwall is overseeing this renovation and alteration, which covers 29,745 sq ft with an estimated cost of $547,000. Construction is scheduled to finish in March 2027, with work starting in September 2025.
The scope of work includes the reconstruction of roadway concrete pavement, sidewalks, and storm drains. The project also involves replacing water lines and sanitary sewer components, as well as updating parkway landscaping improvements. These upgrades are designed to modernize the local transportation corridor and improve utility reliability for the surrounding area.
Project Details and Oversight
Kimley-Horn & Associates, Inc. serves as the design firm of record for this initiative. The registered accessibility specialist on file is Kimberly J Goss. The project was registered with TDLR in June 2025, and plan review was completed in the same month. The TDLR status is listed as Review Complete, confirming that the necessary administrative steps have been finalized before construction begins.
This project involves public funds and is located on public land. The estimated cost of $547,000 places this project above the county median for similar renovation and alteration filings. The scheduled build window of 550 days is longer than the county median of 90 days for comparable work types.
The site is located in Rockwall County, an area with a median household income of $128,590 according to U.S. Census ACS 2023 estimates. Nearby businesses include Zanata, Bin 303, and Rockwall Gentle Dental. The City of Rockwall has four other TDLR-registered projects totaling $8,219,900, indicating a consistent investment in local infrastructure and community facilities. This project contributes to the broader development of the Rockwall transportation network.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75087 (Rockwall)
One email per change. Unsubscribe in one click. Privacy.
W Boydstun Avenue/Forest Trace is a Renovation/Alteration project located at S Lakeshore Dr. to SH 205 (S Goliad St.) in Rockwall, Texas. The project has an estimated value of $547K covering 29,745 sq ft. City of Rockwall is the property owner and Kimley-Horn & Associates, Inc. is the design firm of record. The project was registered with TDLR on June 9, 2025.
Frequently Asked Questions
What is the primary scope of work for this project?
The project involves reconstructing roadway concrete pavement, sidewalks, and storm drains. It also includes replacing water lines, sanitary sewer components, and parkway landscaping improvements.
When is construction scheduled to start and finish?
Construction is scheduled to start in September 2025 and is scheduled to finish in March 2027.
Who is the owner and design firm for this project?
The owner is the City of Rockwall, and the design firm of record is Kimley-Horn & Associates, Inc.
What is the estimated cost and size of the project?
The estimated cost is $547,000, and the project covers 29,745 sq ft of roadway and infrastructure.
What is W Boydstun Avenue/Forest Trace?
W Boydstun Avenue/Forest Trace is a renovation/alteration project at S Lakeshore Dr. to SH 205 (S Goliad St.) in Rockwall, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Furnishing all labor, material, equipment, performing all work required for reconstruction of roadway concrete pavement, sidewalk, storm drain, water line, sanitary sewer, & replacement of parkway landscaping improvements.
Is W Boydstun Avenue/Forest Trace open in Rockwall?
W Boydstun Avenue/Forest Trace is still under construction in Rockwall, TX, with an estimated completion of Mar 2027 according to its TDLR registration.
Where is W Boydstun Avenue/Forest Trace located?
W Boydstun Avenue/Forest Trace is located at S Lakeshore Dr. to SH 205 (S Goliad St.), Rockwall, TX, 75087, in Rockwall County.
Who is the owner or developer of W Boydstun Avenue/Forest Trace?
City of Rockwall is the property owner/developer of record for W Boydstun Avenue/Forest Trace, per its TDLR project registration.
Who is the architect or design firm for W Boydstun Avenue/Forest Trace?
Kimley-Horn & Associates, Inc. is the design firm of record for W Boydstun Avenue/Forest Trace, according to its TDLR filing.
How much does W Boydstun Avenue/Forest Trace cost and how big is it?
W Boydstun Avenue/Forest Trace has an estimated construction value of $547K and approximately 29,745 square feet (about $18/sqft), based on its TDLR filing.
Scope of Work
Furnishing all labor, material, equipment, performing all work required for reconstruction of roadway concrete pavement, sidewalk, storm drain, water line, sanitary sewer, & replacement of parkway landscaping improvements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
S Lakeshore Dr. to SH 205 (S Goliad St.), Rockwall, TX, 75087
Related Projects
Nearby Projects
Within 0.6 miWatch all construction in 75087 (Rockwall)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Rockwall?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.