Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Harrold I.S.D. Gymnasium Addition and Renovations
18106 Stewart St., Harrold, TX, 76364
Harrold I.S.D. Gymnasium Addition and Renovations is a additions to existing building project at 18106 Stewart St., Harrold, in Wilbarger County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $9.0M across about 24,000 sq ft.
- Estimated project value
- $9.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 24,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $375/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 5mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
52 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
517 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Harrold I.S.D. Gymnasium Addition and Renovations
Harrold I.S.D. is building a 20,000 square foot gymnasium addition at 18106 Stewart St. in Harrold, Wilbarger County. The project, filed with the Texas Department of Licensing and Regulation (TDLR) in June 2025, involves adding significant athletic and administrative space to the existing campus. Construction is scheduled to finish in December 2026, with work starting in August 2025.
The scope of work includes locker rooms, a weight room, restrooms, a concession stand, and an admin office. The project also encompasses the renovation of 4,000 square feet of existing locker room space. The total estimated cost for this addition and renovation is $9,000,000, translating to $375 per square foot. This figure is close to the county median of $360 per square foot for similar additions to existing buildings.
Design and Funding
Harper Perkins Architects serves as the design firm of record for the project. The registered accessibility specialist is Tessla Sax Leigh Brewer. The project involves public funds and public land, reflecting its status as a school district improvement. TDLR plan review was completed in June 2025, clearing the path for construction to begin in August 2025.
Harper Perkins Architects has been involved in six other TDLR-registered projects totaling $40,800,000. These include campus projects in Forestburg, Covington, Nocona, and Lindsay, with costs ranging from $3,800,000 to $14,000,000. The Harrold project's estimated cost is above the county median for its type, placing it in the top quarter of similar filings in Wilbarger County.
The scheduled build window for the Harrold project is 517 days, which is longer than the county median of 176 days for additions to existing buildings. This extended timeline accounts for the substantial size of the addition and the concurrent renovation of existing spaces. The project aims to enhance the athletic and administrative capabilities of the school district.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76364 (Harrold)
One email per change. Unsubscribe in one click. Privacy.
Harrold I.S.D. Gymnasium Addition and Renovations is a Additions to Existing Building project located at 18106 Stewart St. in Harrold, Texas. The project has an estimated value of $9.0M covering 24,000 sq ft. Harrold Indendent School District is the property owner and Harper Perkins Architects is the design firm of record. The project was registered with TDLR on June 10, 2025.
Frequently Asked Questions
What is the total cost of the gymnasium addition?
The estimated cost for the Harrold I.S.D. gymnasium addition and renovations is $9,000,000.
Who is the architect for the project?
Harper Perkins Architects is the design firm of record for the Harrold I.S.D. project.
When is construction scheduled to finish?
Construction is scheduled to finish in December 2026, with work starting in August 2025.
What features are included in the new addition?
The addition includes locker rooms, a weight room, restrooms, a concession stand, and an admin office.
Is the project using public funds?
Yes, the project involves public funds and public land as part of the school district's improvements.
What is Harrold I.S.D. Gymnasium Addition and Renovations?
Harrold I.S.D. Gymnasium Addition and Renovations is a additions to existing building project at 18106 Stewart St. in Harrold, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A 20,000s.f. gymnasium addition to the existing building. Addition includes locker rooms, weight room, restrooms, concession stand and admin office. Also included in this project is renovating 4,000s.f. of exist. locker room space.
Is Harrold I.S.D. Gymnasium Addition and Renovations open in Harrold?
Harrold I.S.D. Gymnasium Addition and Renovations is still under construction in Harrold, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is Harrold I.S.D. Gymnasium Addition and Renovations located?
Harrold I.S.D. Gymnasium Addition and Renovations is located at 18106 Stewart St., Harrold, TX, 76364, in Wilbarger County.
Who is the owner or developer of Harrold I.S.D. Gymnasium Addition and Renovations?
Harrold Indendent School District is the property owner/developer of record for Harrold I.S.D. Gymnasium Addition and Renovations, per its TDLR project registration.
Who is the architect or design firm for Harrold I.S.D. Gymnasium Addition and Renovations?
Harper Perkins Architects is the design firm of record for Harrold I.S.D. Gymnasium Addition and Renovations, according to its TDLR filing.
How much does Harrold I.S.D. Gymnasium Addition and Renovations cost and how big is it?
Harrold I.S.D. Gymnasium Addition and Renovations has an estimated construction value of $9.0M and approximately 24,000 square feet (about $375/sqft), based on its TDLR filing.
Scope of Work
A 20,000s.f. gymnasium addition to the existing building. Addition includes locker rooms, weight room, restrooms, concession stand and admin office. Also included in this project is renovating 4,000s.f. of exist. locker room space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
18106 Stewart St., Harrold, TX, 76364
Related Projects
Watch all construction in 76364 (Harrold)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Harrold?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.