The Yard Gym is a renovation/alteration project at 12301 West Parmer Lane, Cedar Park, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $495K across about 2,399 sq ft.
Project has been registered with TDLR and is in pre-construction phase
The Yard Gym is a Renovation/Alteration project located at 12301 West Parmer Lane, Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $495K covering 2,399 sq ft. VLS Properties is the property owner and Parish Line Studio is the design firm of record. The project was registered with TDLR on June 12, 2025.
The Yard Gym is a renovation/alteration project at 12301 West Parmer Lane in Cedar Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: First-generation tenant improvement of 2,399 square feet for a gym franchise.
The Yard Gym is currently under construction in Cedar Park, TX. Its current TDLR status is "Project Registered".
The Yard Gym is located at 12301 West Parmer Lane, Cedar Park, TX, 78613, in Williamson County.
VLS Properties is the property owner/developer of record for The Yard Gym, per its TDLR project registration.
Parish Line Studio is the design firm of record for The Yard Gym, according to its TDLR filing.
The Yard Gym has an estimated construction value of $495K and approximately 2,399 square feet (about $206/sqft), based on its TDLR filing.
First-generation tenant improvement of 2,399 square feet for a gym franchise.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 12, 2025
Review Complete
Inspection Complete
Closed
Building permits found at or near this location
Interior Alteration of Approx. (3895) of existing Suite 425.
Interior Alteration to create new corridor approx. (932) of existing interior space. (Floor 4 Building V)
Interior Alteration of Approx. (4810) of existing Suite 400.
7 DAY - Interior remodel. change single door to double door. bench lab with table power. open call b at existing admin space - OVA
7 DAY - Interior remodel. change single door to double door. bench lab with table power. open call b at existing admin space - OVA