DFW DPS Virtual Training Lab is a renovation/alteration project at 3600 S 20th Ave, Euless, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2025). The project has an estimated value of $400K across about 2,000 sq ft.
Final inspection completed, awaiting project closure
DFW DPS Virtual Training Lab is a Renovation/Alteration project located at 3600 S 20th Ave, Euless, TX 76039 in Euless, Texas. The project has an estimated value of $400K covering 2,000 sq ft. Dallas Fort Worth International Airport is the property owner and Gresham Smith is the design firm of record. The project was registered with TDLR on June 16, 2025.
DFW DPS Virtual Training Lab is a renovation/alteration project at 3600 S 20th Ave in Euless, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Finish existing shell office space to be a training room.
Construction on DFW DPS Virtual Training Lab is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2025. The building is finished and very likely open.
DFW DPS Virtual Training Lab is located at 3600 S 20th Ave, Euless, TX, 76039, in Tarrant County.
Dallas Fort Worth International Airport is the property owner/developer of record for DFW DPS Virtual Training Lab, per its TDLR project registration.
Gresham Smith is the design firm of record for DFW DPS Virtual Training Lab, according to its TDLR filing.
DFW DPS Virtual Training Lab has an estimated construction value of $400K and approximately 2,000 square feet (about $200/sqft), based on its TDLR filing.
Finish existing shell office space to be a training room.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 16, 2025
Review Complete
Jun 16, 2025
Inspection Complete
Dec 13, 2025
Closed
180d
Construction phase