DA11-4
DA11-4 is a renovation/alteration project at 1990 N Stemmons Fwy, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2026. The project has an estimated value of $108.4M across about 95,490 sq ft.
๐Project Metrics
TDLR #TABS2025021434Review Complete
Design review complete, construction may proceed
DA11-4 is a Renovation/Alteration project located at 1990 N Stemmons Fwy, Dallas, TX 75207 in Dallas, Texas. The project has an estimated value of $108.4M covering 95,490 sq ft. Chris Schultz is the property owner and Margulies Hoelzli Architecture is the design firm of record. The project was registered with TDLR on June 17, 2025.
โFrequently Asked Questions
What is DA11-4?
DA11-4 is a renovation/alteration project at 1990 N Stemmons Fwy in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 43,009SF buildout on the first floor, 47,044SF on the second floor, and 5,438SF on the third floor of an existing 4-story data center, including interior partitions, doors, ceilings, mech/elec equipment, 10 generators, generator platformโฆ
Is DA11-4 open in Dallas?
DA11-4 is still under construction in Dallas, TX, with an estimated completion of Aug 2026 according to its TDLR registration.
Where is DA11-4 located?
DA11-4 is located at 1990 N Stemmons Fwy, Dallas, TX, 75207, in Dallas County.
Who is the owner or developer of DA11-4?
Chris Schultz is the property owner/developer of record for DA11-4, per its TDLR project registration.
Who is the architect or design firm for DA11-4?
Margulies Hoelzli Architecture is the design firm of record for DA11-4, according to its TDLR filing.
How much does DA11-4 cost and how big is it?
DA11-4 has an estimated construction value of $108.4M and approximately 95,490 square feet (about $1.14K/sqft), based on its TDLR filing.
๐Scope of Work
43,009SF buildout on the first floor, 47,044SF on the second floor, and 5,438SF on the third floor of an existing 4-story data center, including interior partitions, doors, ceilings, mech/elec equipment, 10 generators, generator platforms, ext stairs
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 17, 2025
Review Complete
Jun 17, 2025
Inspection Complete
Closed