Funding type
This project is privately funded, on private land for private use.
Hines T3 Level 03 - Multi-tenant Corridor and Restroom Expansion in Austin, TX
1211 East 4th st. level 03, Austin, TX, 78701
Hines T3 Level 03 - Multi-tenant Corridor and Restroom Expansion is a renovation/alteration project at 1211 East 4th st. level 03, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $300K across about 3,000 sq ft.
- Estimated project value
- $300K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 3,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $100/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
13 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
91 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Hines T3 Level 03 - Multi-tenant Corridor and Restroom Expansion
T3 ATX Eastside is a renovation project located at 1211 East 4th St., Level 03, in Austin’s East Cesar Chavez neighborhood. The filing, registered with TDLR in June 2025, identifies the work as a multi-tenant corridor extension and an expansion of existing restrooms. This first-generation renovation covers 3,000 square feet with an estimated cost of $300,000.
The project is owned by 4th & Waller Owner, LLC and designed by PDR. The scope involves altering the existing layout to extend the shared corridor and enlarge restroom facilities for tenants. The construction window was scheduled to run from July 2025 to September 2025, a duration of 91 days. This timeline is close to the 98-day median build window for similar renovation and alteration projects in Travis County.
The financial profile of this project aligns with local market averages. The estimated cost of $300,000 is close to the county median of $299,550 for comparable filings. Similarly, the cost per square foot stands at $100, which is close to the median of $103 per square foot. These figures place the project squarely within the typical range for commercial interior work in the area.
The site is situated in a dense commercial corridor. Nearby businesses include Cenote, The White Horse, and Birds Barbershop. The surrounding ZIP code 78701 has a population of approximately 11,114 residents, with a median household income of $154,867. This demographic context reflects a high-income urban environment where commercial real estate development remains active.
City of Austin permit records show significant activity at this street address, with at least 25 permits on file. Recent permits include electrical, plumbing, mechanical, and building categories, many related to tenant finish work in office spaces. While the TDLR record shows plan review was completed in June 2025, the agency has not yet recorded a final inspection. Therefore, the current state of the site is not confirmed in the public record, and the project’s completion status remains unverified in official filings.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78701 (Austin)
One email per change. Unsubscribe in one click. Privacy.
Hines T3 Level 03 - Multi-tenant Corridor and Restroom Expansion is a Renovation/Alteration project located at 1211 East 4th st. level 03, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $300K covering 3,000 sq ft. 4th & Waller Owner, LLC is the property owner and PDR is the design firm of record. The project was registered with TDLR on June 18, 2025.
Frequently Asked Questions
Is T3 ATX Eastside open for business?
The TDLR record does not confirm an opening date. While construction was scheduled to finish in September 2025, the agency has not yet recorded a final inspection, so the operational status of the tenants is not verified in the public record.
Who is the developer of this project?
The owner of record is 4th & Waller Owner, LLC. The design firm listed in the TDLR filing is PDR, which is responsible for the architectural plans for this renovation.
What is the scope of work at 1211 East 4th St.?
The project involves a multi-tenant corridor extension and an expansion of existing restrooms. It is classified as a renovation or alteration, covering 3,000 square feet of space on the third level of the building.
When was the TDLR registration filed?
The project was registered with the Texas Department of Licensing and Regulation in June 2025. Plan review was also completed in that same month, allowing construction to proceed according to the scheduled timeline.
Is the project completed?
The filing lists a completion date of September 2025. However, because TDLR has not yet recorded a final inspection, the official record does not confirm that the work is finished or that the site is ready for occupancy.
What is Hines T3 Level 03 - Multi-tenant Corridor and Restroom Expansion?
Hines T3 Level 03 - Multi-tenant Corridor and Restroom Expansion is a renovation/alteration project at 1211 East 4th st. level 03 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: FIRST GENERATION RENOVATION PROJECT TO INCLUDE A MULTI-TENANT CORRIDOR EXTENSION, AND EXPANSION OF EXISTING RESTROOMS.
Is Hines T3 Level 03 - Multi-tenant Corridor and Restroom Expansion open in Austin?
Hines T3 Level 03 - Multi-tenant Corridor and Restroom Expansion was scheduled to finish construction in Sep 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Hines T3 Level 03 - Multi-tenant Corridor and Restroom Expansion located?
Hines T3 Level 03 - Multi-tenant Corridor and Restroom Expansion is located at 1211 East 4th st. level 03, Austin, TX, 78701, in Travis County.
Who is the owner or developer of Hines T3 Level 03 - Multi-tenant Corridor and Restroom Expansion?
4th & Waller Owner, LLC is the property owner/developer of record for Hines T3 Level 03 - Multi-tenant Corridor and Restroom Expansion, per its TDLR project registration.
Who is the architect or design firm for Hines T3 Level 03 - Multi-tenant Corridor and Restroom Expansion?
PDR is the design firm of record for Hines T3 Level 03 - Multi-tenant Corridor and Restroom Expansion, according to its TDLR filing.
How much does Hines T3 Level 03 - Multi-tenant Corridor and Restroom Expansion cost and how big is it?
Hines T3 Level 03 - Multi-tenant Corridor and Restroom Expansion has an estimated construction value of $300K and approximately 3,000 square feet (about $100/sqft), based on its TDLR filing.
Scope of Work
FIRST GENERATION RENOVATION PROJECT TO INCLUDE A MULTI-TENANT CORRIDOR EXTENSION, AND EXPANSION OF EXISTING RESTROOMS.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1211 East 4th st. level 03, Austin, TX, 78701
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Related City Permits
Building permits found at or near this location
This application is a typical Base permit and there will not be solar panels installed. Action required: Confirm your Austin Energy account information
Upgrading the existing service to 200A
Express: Foundation repair
INSTALL NEW GAS LINE FROM GAS METER TO GAS GRILL LOCATIONS FOR POOL CABANA **Customer clarified Its replacing an old line with a new one. Not brand new gas line.
Emergency Repair section of 4 Domestic Water line at Travis High School. Work was conducted over the weekend. We would like to have this inspected as soon as possible to cover up this area and have concrete poured back.
Watch all construction in 78701 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.