Doe Branch Pedestrian Trail and Bridge

Southside of Fishtrap Rd at Denton way, Prosper, TX, 75078

Construction complete · Aug 2026Inspection Complete

Doe Branch Pedestrian Trail and Bridge is a new construction project at Southside of Fishtrap Rd at Denton way, Prosper, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $1.5M across about 10,000 sq ft.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
10,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$150/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
10 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 24, 2025408 days across supplied datesAug 6, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    36 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    304 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    68 days after the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75078 (Prosper)

One email per change. Unsubscribe in one click. Privacy.

Doe Branch Pedestrian Trail and Bridge is a New Construction project located at Southside of Fishtrap Rd at Denton way, Prosper, TX 75078 in Prosper, Texas. The project has an estimated value of $1.5M covering 10,000 sq ft. Town of Prosper is the property owner and Parkhill is the design firm of record. The project was registered with TDLR on June 24, 2025.

Frequently Asked Questions

What is Doe Branch Pedestrian Trail and Bridge?

Doe Branch Pedestrian Trail and Bridge is a new construction project at Southside of Fishtrap Rd at Denton way in Prosper, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: long concrete trail, prefabricated pedestrian bridge, and curb ramps

Is Doe Branch Pedestrian Trail and Bridge open in Prosper?

Construction on Doe Branch Pedestrian Trail and Bridge is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is Doe Branch Pedestrian Trail and Bridge located?

Doe Branch Pedestrian Trail and Bridge is located at Southside of Fishtrap Rd at Denton way, Prosper, TX, 75078, in Collin County.

Who is the owner or developer of Doe Branch Pedestrian Trail and Bridge?

Town of Prosper is the property owner/developer of record for Doe Branch Pedestrian Trail and Bridge, per its TDLR project registration.

Who is the architect or design firm for Doe Branch Pedestrian Trail and Bridge?

Parkhill is the design firm of record for Doe Branch Pedestrian Trail and Bridge, according to its TDLR filing.

How much does Doe Branch Pedestrian Trail and Bridge cost and how big is it?

Doe Branch Pedestrian Trail and Bridge has an estimated construction value of $1.5M and approximately 10,000 square feet (about $150/sqft), based on its TDLR filing.

Scope of Work

long concrete trail, prefabricated pedestrian bridge, and curb ramps

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Southside of Fishtrap Rd at Denton way, Prosper, TX, 75078

Location by street address

Watch all construction in 75078 (Prosper)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.