Project intelligenceTDLR TABS2025022131Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Glen Rose ISD Existing CTE Building Renovations

901 Stadium Dr, Glen Rose, TX, 76043

Construction complete · Jun 2026Inspection Complete

Glen Rose ISD Existing CTE Building Renovations is a renovation/alteration project at 901 Stadium Dr, Glen Rose, in Somervell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $2.8M across about 16,917 sq ft.

Estimated project value
$2.8M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
16,917 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$163/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
9 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 26, 2025359 days across supplied datesJun 20, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    39 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    273 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    47 days after the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76043 (Glen Rose)

One email per change. Unsubscribe in one click. Privacy.

Glen Rose ISD Existing CTE Building Renovations is a Renovation/Alteration project located at 901 Stadium Dr, Glen Rose, TX 76043 in Glen Rose, Texas. The project has an estimated value of $2.8M covering 16,917 sq ft. Glen Rose ISD is the property owner and Jacob & Martin LLC is the design firm of record. The project was registered with TDLR on June 26, 2025.

Frequently Asked Questions

What is Glen Rose ISD Existing CTE Building Renovations?

Glen Rose ISD Existing CTE Building Renovations is a renovation/alteration project at 901 Stadium Dr in Glen Rose, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing Glen Rose ISD CTE Building (16,917sf)

Is Glen Rose ISD Existing CTE Building Renovations open in Glen Rose?

Construction on Glen Rose ISD Existing CTE Building Renovations is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.

Where is Glen Rose ISD Existing CTE Building Renovations located?

Glen Rose ISD Existing CTE Building Renovations is located at 901 Stadium Dr, Glen Rose, TX, 76043, in Somervell County.

Who is the owner or developer of Glen Rose ISD Existing CTE Building Renovations?

Glen Rose ISD is the property owner/developer of record for Glen Rose ISD Existing CTE Building Renovations, per its TDLR project registration.

Who is the architect or design firm for Glen Rose ISD Existing CTE Building Renovations?

Jacob & Martin LLC is the design firm of record for Glen Rose ISD Existing CTE Building Renovations, according to its TDLR filing.

How much does Glen Rose ISD Existing CTE Building Renovations cost and how big is it?

Glen Rose ISD Existing CTE Building Renovations has an estimated construction value of $2.8M and approximately 16,917 square feet (about $163/sqft), based on its TDLR filing.

Scope of Work

Renovation of existing Glen Rose ISD CTE Building (16,917sf)

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

901 Stadium Dr, Glen Rose, TX, 76043

Location by street address

Watch all construction in 76043 (Glen Rose)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Glen Rose?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.