OR 4
๐Project Metrics
TDLR #TABS2025022170Inspection Complete
Final inspection completed, awaiting project closure
๐Scope of Work
Equipment installation at an existing warm shell OR
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$3.6M total๐๏ธSame Design Firm
$7.4M total๐Related City Permits
Building permits found at or near this location
Cap off Water and Wastewater
Replace tub with new tub Replace tile on 3 walls in shower area replace GFCI outlet in master bathroom.
Replace tub with new tub Replace tile on 3 walls in shower area replace GFCI outlet in master bathroom.
Replace tub with new tub Replace tile on 3 walls in shower area replace GFCI outlet in master bathroom.
Replacement of complete existing central heat and air system with or without duct work Located in Hallway closet.