Project intelligenceTDLR TABS2025022179Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Taco Bell Airport in Irving, TX

1025 W Airport Freeway, Irving, TX, 75062

Construction complete · Jun 2026Inspection Complete

Taco Bell Airport is a renovation/alteration project at 1025 W Airport Freeway, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $56K across about 928 sq ft.

Estimated project value
$56K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
928 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$60/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
21 days
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 26, 2025359 days across supplied datesJun 20, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    81 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    21 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    257 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Taco Bell Airport

The renovation of the Taco Bell at 1025 W Airport Freeway in Irving is complete. The project, filed as Taco Bell Airport, involved the interior alteration of an existing 928 sq ft facility. The work included a new 250 sq ft beverage station with updated equipment, fixtures, and finishes, along with a new front counter. Additional updates covered dining and restroom areas with new furniture, flooring, wall treatments, ceilings, and lighting.

Taco Bell of America LLC served as the owner of record for this privately funded project on private land. Valerio Architects was the design firm of record, and Julie Ericson Gereda acted as the registered accessibility specialist. The estimated cost for the renovation was $55,680, which equates to $60 per square foot. This figure is below the Dallas County median of $73 per square foot for similar renovation and alteration filings.

The project timeline was concise. Construction started in September 2025, and the scheduled build window was 21 days, which is shorter than the 92-day median for comparable projects in the county. The final TDLR accessibility inspection passed in June 2026, confirming the completion of the work.

Project Context and Location

Located in the Del Paseo area of Dallas County, the site is near other registered renovation projects, including Baylor Scott & White Medical Center - Irving. The surrounding ZIP code 75062 has a population of about 52,756, with a median household income of $70,792. Housing in this area is mostly renter-occupied, with 18,718 housing units and a median owner-occupied home value of $254,500 according to U.S. Census estimates.

Taco Bell of America LLC has three other TDLR-registered projects in the region, all with completed inspections. These include locations in Mesquite and Irving with costs ranging from $54,300 to $70,800. Valerio Architects has worked on six other registered projects, including locations in Watauga and Grand Prairie. The Dallas County unemployment rate was 3 percent in August 2026, lower than a year earlier.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75062 (Irving)

One email per change. Unsubscribe in one click. Privacy.

Taco Bell Airport is a Renovation/Alteration project located at 1025 W Airport Freeway, Irving, TX 75062 in Irving, Texas. The project has an estimated value of $56K covering 928 sq ft. Taco Bell of America LLC is the property owner and Valerio Architects is the design firm of record. The project was registered with TDLR on June 26, 2025.

Frequently Asked Questions

Is the Taco Bell in Irving open?

The TDLR record confirms the construction is complete with a passed final inspection in June 2026. However, the registration data does not specify the business opening date or current operating hours.

What was the cost of the renovation?

The estimated cost for the interior renovation was $55,680. This amount is below the Dallas County median for similar renovation filings, which stands at $249,838.

Who designed the Taco Bell renovation?

Valerio Architects was the design firm of record for the project. They have completed several other TDLR-registered renovation projects in the Dallas-Fort Worth area.

What changes were made to the store?

The renovation included a new 250 sq ft beverage station, new front counter, and updates to dining and restroom areas with new furniture, flooring, and lighting.

When did construction finish?

The project passed its final TDLR accessibility inspection in June 2026, marking the completion of the construction phase.

What is Taco Bell Airport?

Taco Bell Airport is a renovation/alteration project at 1025 W Airport Freeway in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of an existing Taco Bell. Includes a new 250 sf beverage station with new equipment, fixtures, finishes and new front counter. Other dining and restroom area updates are new furniture, new floor, wall finishes, ceilin…

Is Taco Bell Airport open in Irving?

Construction on Taco Bell Airport is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.

Where is Taco Bell Airport located?

Taco Bell Airport is located at 1025 W Airport Freeway, Irving, TX, 75062, in Dallas County.

Who is the owner or developer of Taco Bell Airport?

Taco Bell of America LLC is the property owner/developer of record for Taco Bell Airport, per its TDLR project registration.

Who is the architect or design firm for Taco Bell Airport?

Valerio Architects is the design firm of record for Taco Bell Airport, according to its TDLR filing.

How much does Taco Bell Airport cost and how big is it?

Taco Bell Airport has an estimated construction value of $56K and approximately 928 square feet (about $60/sqft), based on its TDLR filing.

Scope of Work

Interior renovation of an existing Taco Bell. Includes a new 250 sf beverage station with new equipment, fixtures, finishes and new front counter. Other dining and restroom area updates are new furniture, new floor, wall finishes, ceiling, lighting

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1025 W Airport Freeway, Irving, TX, 75062

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75062 (Irving)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.