Project intelligenceTDLR TABS2025022542New Construction
Funding type

This project is privately funded, on private land for private use.

Xinquan Austin Factory 1 Phase 2B

6925 FM Road 1327, Mustang Ridge, TX, 78747

Target date passed (Nov 2025)Review Complete

Xinquan Austin Factory 1 Phase 2B is a new construction project at 6925 FM Road 1327, Mustang Ridge, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Nov 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $204K across about 218,400 sq ft.

Estimated project value
$204K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
218,400 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 2, 2025151 days across supplied datesNov 30, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    29 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    122 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Xinquan Austin Factory 1 Phase 2B

Xinquan Austin Factory 1 Phase 2B is a new construction project located at 6925 FM Road 1327 in Mustang Ridge, Texas. The filing describes the scope as the construction of a new factory, storage, and mechanical building. The project is registered with TDLR and has not yet recorded a final inspection, meaning the current state of the site is not confirmed in the public record.

The owner of record is QBS Consulting Group LLC. The registered accessibility specialist for this project is Edwin Lim Alfaro. The estimated cost for the work is $204,053, covering a total area of 218,400 square feet. This results in a computed cost of $1 per square foot. The project is privately funded and situated on private land for private use.

Plan review was completed in July 2025, and construction was scheduled to begin in the same month. The filing listed a completion date of November 2025. Although that date has passed, the TDLR status remains Review Complete, and the lack of a final inspection record indicates that the project's completion is not verified in the official file.

Project Context and Scale

This project is part of a broader development area in Mustang Ridge. Other registered projects in the vicinity include the Mustang Ridge Distribution Center I, Aztec Glass & Mirror, and Maha Court.

When compared to other new construction filings in Travis County, this project's estimated cost is below the county median. The scheduled build window of 122 days is shorter than the county median of 304 days. The cost per square foot is also below the county median of $125. These figures are derived from TDLR-registered filings and provide context for the project's scale relative to other new construction in the region.

The local area, identified by ZIP code 78747, has a population of about 21,757 according to U.S. Census estimates. The median household income in this area is $86,456, and the median owner-occupied home value is $395,500. Nearby businesses include La Bonita Mexican Restaurant, Austin VeeDub, and Atlas Truck Repair, indicating a mix of service and commercial establishments in the immediate vicinity.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78747 (Mustang Ridge)

One email per change. Unsubscribe in one click. Privacy.

Xinquan Austin Factory 1 Phase 2B is a New Construction project located at 6925 FM Road 1327, Mustang Ridge, TX 78747 in Mustang Ridge, Texas. The project has an estimated value of $204K covering 218,400 sq ft. QBS Consulting Group LLC is the property owner. The project was registered with TDLR on July 2, 2025.

Frequently Asked Questions

Is the Xinquan Austin Factory open for business?

The TDLR record has not yet recorded a final inspection. Therefore, the public record does not confirm that the construction is complete or that the business is operating.

What is the address of the Xinquan Austin Factory?

The project is located at 6925 FM Road 1327, Mustang Ridge, TX 78747. This address is listed in the TDLR registration for the new factory and storage building.

Who is the owner of the Xinquan Austin Factory project?

The owner of record listed in the filing is QBS Consulting Group LLC. The project is privately funded and developed on private land.

How large is the Xinquan Austin Factory building?

The filing specifies a size of 218,400 square feet. The scope includes a new factory, storage, and mechanical building structure.

What is the estimated cost of the construction?

The estimated cost for the project is $204,053. This figure is based on the TDLR registration details for the new construction work.

What is Xinquan Austin Factory 1 Phase 2B?

Xinquan Austin Factory 1 Phase 2B is a new construction project at 6925 FM Road 1327 in Mustang Ridge, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a new factory/storage/mechanical building.

Is Xinquan Austin Factory 1 Phase 2B open in Mustang Ridge?

Xinquan Austin Factory 1 Phase 2B was scheduled to finish construction in Nov 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Xinquan Austin Factory 1 Phase 2B located?

Xinquan Austin Factory 1 Phase 2B is located at 6925 FM Road 1327, Mustang Ridge, TX, 78747, in Travis County.

Who is the owner or developer of Xinquan Austin Factory 1 Phase 2B?

QBS Consulting Group LLC is the property owner/developer of record for Xinquan Austin Factory 1 Phase 2B, per its TDLR project registration.

How much does Xinquan Austin Factory 1 Phase 2B cost and how big is it?

Xinquan Austin Factory 1 Phase 2B has an estimated construction value of $204K and approximately 218,400 square feet (about $1/sqft), based on its TDLR filing.

Scope of Work

Construction of a new factory/storage/mechanical building.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

6925 FM Road 1327, Mustang Ridge, TX, 78747

Location by street address

Related City Permits

Building permits found at or near this location

6925 VIA CORRETO DR

Install new 240 volt 35 amp breaker in 200 amp main panel. This is to control a new A/C mini split unit for the garage. A/C condenser will be installed within 10ft of electrical panel so that the breaker will serve as the disconnecting means in lieu of external pull handle disconnect.

ActiveElectrical PermitRepairApr 2026
View Details
2026-045089 EP
Reynolds & Co Electrical Solutions
6925 MITRA DR

Express: Replace 4 windows like for like

ExpiredBuilding PermitRepairSep 2025
$1
View Details
2025-113714 BP
PWD-Austin, LLC (d/b/a or registered trade name) Pella Windows & Doors of Austin
6925 HANSA LOOP

Nayak: EV Charging Station Installation and Service Upgrade - PEC.

FinalElectrical PermitRepairNov 2024
View Details
2018-061422 EP
SMART CHARGE RESIDENTAL LLC
6925 BARSTOW CT

Replace panel & meter socket. Utility company is PEC.

FinalElectrical PermitRepairOct 2024
View Details
2024-141952 EP
Service Company of San Antonio LLC dba Mr Electric of Austin
6925 BARSTOW CT

Replacement of complete existing central heat and air system with or without duct work

FinalMechanical PermitChange OutApr 2023
View Details
2023-043747 MP

Watch all construction in 78747 (Mustang Ridge)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists