Project intelligenceTDLR TABS2025022589New Construction
Funding type

This project is privately funded, on private land for private use.

SMU Ignited Monument in Dallas, TX

3100 McFarlin Blvd, Dallas, TX, 75205

Construction complete · Nov 2026Inspection Complete

SMU Ignited Monument is a new construction project at 3100 McFarlin Blvd, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2026). The project has an estimated value of $250K across about 220 sq ft.

Estimated project value
$250K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
220 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.14K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 2, 2025497 days across supplied datesNov 11, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    30 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    406 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SMU Ignited Monument

Southern Methodist University has completed the SMU Ignited Monument, a new 220-square-foot dedication structure located at 3100 McFarlin Blvd in Dallas. The project, situated in the Park Cities area of Dallas County, involved the construction of a 10-foot by 22-foot monument. The filing indicates a total estimated cost of $250,000, resulting in a cost per square foot of $1136. This specific work is registered with the Texas Department of Licensing and Regulation (TDLR) as a new construction accessibility project.

The owner and developer of record for this site is Southern Methodist University. The design firm responsible for the project is FBT Architects, a firm with a broader portfolio of TDLR-registered projects in the region. The registered accessibility specialist overseeing the compliance aspects of this build is Stephen D Macphie. The project is privately funded and located on private land designated for private use, distinguishing it from public infrastructure projects in the surrounding ZIP 75205 area.

Construction timelines for this specific monument were relatively brief. The TDLR registration occurred in July 2025, with plan review also completed in July of that same year. Construction was scheduled to begin in August 2025, with a completion date listed on the filing as October 2025. When compared to other new construction filings in Dallas County, the scheduled build window for this project was shorter than the county median of 243 days. The estimated cost of $250,000 is below the county median of $950,000 for its type.

Despite the filing indicating an October 2025 completion, the actual regulatory status reflects a later timeline. The project passed its final TDLR accessibility inspection in November 2026. This inspection confirms that the construction work meets the required accessibility standards for the structure. The current TDLR status for the project is listed as Inspection Complete, marking the end of the regulatory construction phase for this dedication monument.

SMU has a history of TDLR-registered projects in the area, including work on the Bridwell Library, the Dedman Center or Lifetime Sports, and the Heroy Science Lab Building. The total value of six other TDLR-registered projects for the university reaches $100,225,689. Nearby businesses in the Park Cities neighborhood include Kuby's Sausage House, Bubba's Cooks Country, and Trek Bicycle Dallas Park Cities. The area profile for ZIP 75205 shows a median household income of $188,396 according to U.S. Census ACS 2023 estimates.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75205 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

SMU Ignited Monument is a New Construction project located at 3100 McFarlin Blvd, Dallas, TX 75205 in Dallas, Texas. The project has an estimated value of $250K covering 220 sq ft. Southern Methodist University is the property owner and FBT Architects is the design firm of record. The project was registered with TDLR on July 2, 2025.

Frequently Asked Questions

Who is the owner of the SMU Ignited Monument project?

Southern Methodist University is the owner and developer of record for this project. The university is responsible for the privately funded construction of the 220-square-foot dedication monument at 3100 McFarlin Blvd in Dallas.

What is the total cost of this monument construction?

The estimated cost for the SMU Ignited Monument is $250,000. This figure covers the new construction of the 10ft x 22ft structure. The cost per square foot for this specific project is calculated at $1136.

When was the final inspection completed for this project?

The project passed its final TDLR accessibility inspection in November 2026. This date confirms the construction status is complete. The filing originally listed an October 2025 completion date, but the regulatory inspection occurred later.

Which design firm worked on this accessibility project?

FBT Architects is the design firm of record for the SMU Ignited Monument. FBT Architects has other TDLR-registered projects in Texas, including work on the SMU Moody Coliseum and the East Campus Tower in Dallas.

Is the business at 3100 McFarlin Blvd open?

The TDLR record covers construction only and does not record whether the business has started serving customers. The page confirms the final TDLR accessibility inspection was passed, but business opening status is not included in the construction filing.

What is SMU Ignited Monument?

SMU Ignited Monument is a new construction project at 3100 McFarlin Blvd in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 10ft x 22ft (220sf) dedication monument

Is SMU Ignited Monument open in Dallas?

Construction on SMU Ignited Monument is complete — TDLR records show the project passed its required accessibility inspection in Nov 2026. The building is finished and very likely open.

Where is SMU Ignited Monument located?

SMU Ignited Monument is located at 3100 McFarlin Blvd, Dallas, TX, 75205, in Dallas County.

Who is the owner or developer of SMU Ignited Monument?

Southern Methodist University is the property owner/developer of record for SMU Ignited Monument, per its TDLR project registration.

Who is the architect or design firm for SMU Ignited Monument?

FBT Architects is the design firm of record for SMU Ignited Monument, according to its TDLR filing.

How much does SMU Ignited Monument cost and how big is it?

SMU Ignited Monument has an estimated construction value of $250K and approximately 220 square feet (about $1.14K/sqft), based on its TDLR filing.

Scope of Work

New 10ft x 22ft (220sf) dedication monument

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3100 McFarlin Blvd, Dallas, TX, 75205

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75205 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.