Cityview Center - Bldg. 3 - Suite 310 is a renovation/alteration project at 1120 South Capital of Texas Highway, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $250K across about 6,685 sq ft.
Final inspection completed, awaiting project closure
Cityview Center - Bldg. 3 - Suite 310 is a Renovation/Alteration project located at 1120 South Capital of Texas Highway, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $250K covering 6,685 sq ft. Stream Realty is the property owner and Levy Dykema Architects is the design firm of record. The project was registered with TDLR on July 7, 2025.
Cityview Center - Bldg. 3 - Suite 310 is a renovation/alteration project at 1120 South Capital of Texas Highway in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing tenant suite for new tenant.
Construction on Cityview Center - Bldg. 3 - Suite 310 is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
Cityview Center - Bldg. 3 - Suite 310 is located at 1120 South Capital of Texas Highway, Austin, TX, 78746, in Travis County.
Stream Realty is the property owner/developer of record for Cityview Center - Bldg. 3 - Suite 310, per its TDLR project registration.
Levy Dykema Architects is the design firm of record for Cityview Center - Bldg. 3 - Suite 310, according to its TDLR filing.
Cityview Center - Bldg. 3 - Suite 310 has an estimated construction value of $250K and approximately 6,685 square feet (about $37/sqft), based on its TDLR filing.
Renovation of existing tenant suite for new tenant.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jul 7, 2025
Review Complete
Jul 7, 2025
Inspection Complete
Apr 10, 2026
Closed
277d
Construction phase
Building permits found at or near this location
PB- New construction 2 story 4 bed 2.5 bath with attached garage and covered porch and patio
New construction of 2 story SFR with 4 beds 2.5 baths opt gourmet kitchen opt ext cov patio cov patio porch and 2 car garage PUD
Replacement of an existing water heater WATER HEATER TANKLESS CHANGE-OUT
Replacement of complete existing central heat and air system with or without duct work 4-TON CONDENSER CHANGE-OUT & 88K BTU FURNACE CHANGE-OUT
New two-story SFR *PRODUCTION BUILDER- GREEN BUILDING* 4 bed 3.5 bath with attached garage front covered porch and rear covered patio