SH 35 (CSJ: 0178-02-090) in Pearland, TX
From: FM 1518 To: BS 35C, Pearland, TX, 77581
SH 35 (CSJ: 0178-02-090) is a renovation/alteration project at From: FM 1518 To: BS 35C, Pearland, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $8.8M across about 1,697 sq ft.
- Estimated project value
- $8.8M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,697 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $5.16K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 7 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
180 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
197 days after the preceding date shown.
Source: TDLR filing
View source record
📰About SH 35 (CSJ: 0178-02-090)
The Texas Department of Transportation, Houston District, filed a renovation and alteration project for State Highway 35 in Pearland, Texas. The project, identified as CSJ: 0178-02-090, is located from FM 1518 to the SH 35C business street in Brazoria County. The estimated cost for this roadway improvement is $8,750,489, covering a scope that includes pavement repair, a 1.5-inch underseal course, a 1.5-inch asphalt concrete overlay, traffic signal updates, sidewalk work, signs, and pavement markings.
This filing was registered with the Texas Department of Licensing and Regulation (TDLR) in July 2025. The registered accessibility specialist on record is Frank Fonseca. The construction schedule in the filing indicates a start date of January 2026 and a target completion date of July 2026. The project involves public funds and is situated on public land, consistent with its status as a Federally funded roadway project.
Project Scope and Cost Context
The scope of work focuses on rehabilitation rather than new construction, specifically addressing the pavement surface and related infrastructure. The estimated cost of $8,750,489 is above the county median for renovation and alteration filings in Brazoria County, which stands at $250,000. The scheduled build window of 197 days is longer than the county median of 95 days for similar projects. The cost per square foot, calculated at $5,156, is significantly above the county median of $89, reflecting the specialized nature of highway maintenance and signal upgrades.
According to the TDLR public record, no plan review or inspection has been recorded since the registration. This means that whether the project has proceeded according to the scheduled timeline is not confirmed in the available public data. The status remains "Project Registered" without further documentation of active construction milestones or final completion reports in the system.
These include projects in Friendswood, Texas City, and Houston. The presence of this SH 35 project in Pearland aligns with the district’s broader infrastructure maintenance efforts across Brazoria County. Local construction platforms list this project under the name "SH 35 CSJ: 0178-02-090," indicating its visibility in public bidding and project tracking systems.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77581 (Pearland)
One email per change. Unsubscribe in one click. Privacy.
SH 35 (CSJ: 0178-02-090) is a Renovation/Alteration project located at From: FM 1518 To: BS 35C, Pearland, TX 77581 in Pearland, Texas. The project has an estimated value of $8.8M covering 1,697 sq ft. TxDOT District: Houston is the property owner. The project was registered with TDLR on July 9, 2025.
Frequently Asked Questions
What is the scope of work for CSJ: 0178-02-090?
The filing lists pavement repair, a 1.5-inch underseal course, a 1.5-inch ACP overlay, traffic signal installation, sidewalk work, signs, and pavement markings.
Who is the registered accessibility specialist?
Frank Fonseca is the registered accessibility specialist listed on the TDLR filing for this project.
Is the project complete?
The filing lists a target completion date of July 2026, but no plan review or inspection has been recorded, so completion is not confirmed in the public record.
Where is the project located?
The project is located on State Highway 35 from FM 1518 to the SH 35C business street in Pearland, Texas 77581.
What is SH 35 (CSJ: 0178-02-090)?
SH 35 (CSJ: 0178-02-090) is a renovation/alteration project at From: FM 1518 To: BS 35C in Pearland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Pavement repair, planning 1.5", underseal course, 1.5" ACP overlay, traffic signal, sidewalk, signs and pavement markings.
Is SH 35 (CSJ: 0178-02-090) open in Pearland?
SH 35 (CSJ: 0178-02-090) was scheduled to finish construction in Jul 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is SH 35 (CSJ: 0178-02-090) located?
SH 35 (CSJ: 0178-02-090) is located at From: FM 1518 To: BS 35C, Pearland, TX, 77581, in Brazoria County.
Who is the owner or developer of SH 35 (CSJ: 0178-02-090)?
TxDOT District: Houston is the property owner/developer of record for SH 35 (CSJ: 0178-02-090), per its TDLR project registration.
How much does SH 35 (CSJ: 0178-02-090) cost and how big is it?
SH 35 (CSJ: 0178-02-090) has an estimated construction value of $8.8M and approximately 1,697 square feet (about $5.16K/sqft), based on its TDLR filing.
Scope of Work
Pavement repair, planning 1.5", underseal course, 1.5" ACP overlay, traffic signal, sidewalk, signs and pavement markings.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
From: FM 1518 To: BS 35C, Pearland, TX, 77581
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Watch all construction in 77581 (Pearland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Pearland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.