Travis Club
1200 Torres Tower Way, Spicewood, TX, 78669
Travis Club is a new construction project at 1200 Torres Tower Way, Spicewood, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $11.3M across about 11,890 sq ft.
- Estimated project value
- $11.3M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 11,890 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $947/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 3mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
54 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
456 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Travis Club
Golf House is a new 11,890-square-foot commercial building under construction at 1200 Torres Tower Way in Spicewood, Texas. The project, filed with the Texas Department of Licensing and Regulation (TDLR) as Travis Club, involves the construction of a two-story facility with an additional 2,950 square feet of covered outdoor area. Situated in Travis County, this development represents a significant addition to the local hospitality and recreational infrastructure.
The estimated cost for this new construction is $11,255,000, which calculates to $947 per square foot. This figure is above the county median of $125 per square foot for similar new construction filings. The scheduled build window is 456 days, which is longer than the county median of 304 days. These metrics place the project in the upper range of investment and duration compared to other recent registrations in the area.
Scope and Design
The building program includes a bar and restaurant, a kitchen, a golf pro shop, and dedicated golf simulator rooms. Additional spaces consist of locker rooms, employee offices, and back-of-house support areas. Hart Howerton Partners Ltd. is the design firm of record for this project. The owner of record is HH-CH-B Blue Lake LLC, which also has one other TDLR-registered project in Spicewood totaling $585,144. Stacey L Brewer is the registered accessibility specialist for this filing.
TDLR completed plan review in July 2025, and construction is scheduled to finish in December 2026, with work starting September 2025. This private, privately funded project is on private land for private use. The registration status is Review Complete, reflecting the administrative progress of the construction timeline.
The surrounding area, ZIP code 78669, has a population of about 11,980 residents. Census estimates for this area indicate a median household income of $126,422 and a median owner-occupied home value of $576,200. Housing in this region is predominantly owner-occupied, with 5,967 housing units recorded. The project adds to the commercial landscape of this established residential community in the Texas Hill Country.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78669 (Spicewood)
One email per change. Unsubscribe in one click. Privacy.
Travis Club is a New Construction project located at 1200 Torres Tower Way, Spicewood, TX 78669 in Spicewood, Texas. The project has an estimated value of $11.3M covering 11,890 sq ft. HH-CH-B Blue Lake LLC is the property owner and Hart Howerton Partners Ltd. is the design firm of record. The project was registered with TDLR on July 9, 2025.
Frequently Asked Questions
When is Golf House scheduled to finish construction?
Construction is scheduled to finish in December 2026. Work started in September 2025, following the completion of plan review by TDLR in July 2025.
What is the total square footage of the new building?
The building is 11,890 square feet. It also includes 2,950 square feet of covered outdoor area as part of the total project scope.
Who is the owner of the Golf House project?
The owner of record is HH-CH-B Blue Lake LLC. The design firm of record is Hart Howerton Partners Ltd.
What is the estimated cost of this construction project?
The estimated cost is $11,255,000. This equates to $947 per square foot, which is above the Travis County median for new construction filings.
Is the Golf House currently open to the public?
The TDLR record indicates construction is scheduled to finish in December 2026. There is no information in the filing confirming that the business is open or operating.
What is Travis Club?
Travis Club is a new construction project at 1200 Torres Tower Way in Spicewood, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a 11,890 GSF 2 story building with 2,950 GSF of covered outdoor area. Program includes a bar and restaurant, a kitchen, a golf pro shop, golf simulator rooms, locker rooms, employee offices, and BOH/support spaces.
Is Travis Club open in Spicewood?
Travis Club is still under construction in Spicewood, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is Travis Club located?
Travis Club is located at 1200 Torres Tower Way, Spicewood, TX, 78669, in Travis County.
Who is the owner or developer of Travis Club?
HH-CH-B Blue Lake LLC is the property owner/developer of record for Travis Club, per its TDLR project registration.
Who is the architect or design firm for Travis Club?
Hart Howerton Partners Ltd. is the design firm of record for Travis Club, according to its TDLR filing.
How much does Travis Club cost and how big is it?
Travis Club has an estimated construction value of $11.3M and approximately 11,890 square feet (about $947/sqft), based on its TDLR filing.
Scope of Work
Construction of a 11,890 GSF 2 story building with 2,950 GSF of covered outdoor area. Program includes a bar and restaurant, a kitchen, a golf pro shop, golf simulator rooms, locker rooms, employee offices, and BOH/support spaces.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1200 Torres Tower Way, Spicewood, TX, 78669
Related Projects
Same Owner
$11.8M totalRelated City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Replace existing cast iron drain piping located beneath the residence with new PVC drain piping. Work will include tunneling beneath the structure as necessary to access and replace only the existing underground drain lines under the house. No yard line replacement or exterior sewer line replacement is included in this scope of work.
Irrigaton installation front and back
Remove existing natural gas 50 Gallon Water Heater.
Replacement of complete existing central heat and air system with or without duct work
Watch all construction in 78669 (Spicewood)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Spicewood?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.