Randa
Randa is a renovation/alteration project at 5401 N. Riverside Drive, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $1.0M across about 38,063 sq ft.
๐Project Metrics
TDLR #TABS2025023190Inspection Complete
Final inspection completed, awaiting project closure
Randa is a Renovation/Alteration project located at 5401 N. Riverside Drive, Fort Worth, TX 76137 in Fort Worth, Texas. The project has an estimated value of $1.0M covering 38,063 sq ft. Havelock Logistics (West 1) Assets LLC is the property owner and BHA Studio is the design firm of record. The project was registered with TDLR on July 10, 2025.
โFrequently Asked Questions
What is Randa?
Randa is a renovation/alteration project at 5401 N. Riverside Drive in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Renovations
Is Randa open in Fort Worth?
Construction on Randa is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
Where is Randa located?
Randa is located at 5401 N. Riverside Drive, Fort Worth, TX, 76137, in Tarrant County.
Who is the owner or developer of Randa?
Havelock Logistics (West 1) Assets LLC is the property owner/developer of record for Randa, per its TDLR project registration.
Who is the architect or design firm for Randa?
BHA Studio is the design firm of record for Randa, according to its TDLR filing.
How much does Randa cost and how big is it?
Randa has an estimated construction value of $1.0M and approximately 38,063 square feet (about $26/sqft), based on its TDLR filing.
๐Scope of Work
Interior Renovations
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 10, 2025
Review Complete
Jul 10, 2025
Inspection Complete
Jun 20, 2026
Closed
345d
Construction phase