Project intelligenceTDLR TABS2025023388New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Tamarron Crossing Phases 1B & Phase 3 Landscape Improvements

Tamarron Crossing & Woods Road/Jordan Ranch Blvd, Fulshear, TX, 77441

Target date passed (May 2026)Review Complete

Tamarron Crossing Phases 1B & Phase 3 Landscape Improvements is a new construction project at Tamarron Crossing & Woods Road/Jordan Ranch Blvd, Fulshear, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish May 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $832K across about 205,000 sq ft.

Estimated project value
$832K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
205,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$4/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 14, 2025291 days across supplied datesMay 1, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    49 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    242 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77441 (Fulshear)

One email per change. Unsubscribe in one click. Privacy.

Tamarron Crossing Phases 1B & Phase 3 Landscape Improvements is a New Construction project located at Tamarron Crossing & Woods Road/Jordan Ranch Blvd, Fulshear, TX 77441 in Fulshear, Texas. The project has an estimated value of $832K covering 205,000 sq ft. D.R. HORTON is the property owner and KGA DeForest Design, LLC is the design firm of record. The project was registered with TDLR on July 14, 2025.

Frequently Asked Questions

What is Tamarron Crossing Phases 1B & Phase 3 Landscape Improvements?

Tamarron Crossing Phases 1B & Phase 3 Landscape Improvements is a new construction project at Tamarron Crossing & Woods Road/Jordan Ranch Blvd in Fulshear, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalk, Landscape, Irrigation

Is Tamarron Crossing Phases 1B & Phase 3 Landscape Improvements open in Fulshear?

Tamarron Crossing Phases 1B & Phase 3 Landscape Improvements was scheduled to finish construction in May 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Tamarron Crossing Phases 1B & Phase 3 Landscape Improvements located?

Tamarron Crossing Phases 1B & Phase 3 Landscape Improvements is located at Tamarron Crossing & Woods Road/Jordan Ranch Blvd, Fulshear, TX, 77441, in Fort Bend County.

Who is the owner or developer of Tamarron Crossing Phases 1B & Phase 3 Landscape Improvements?

D.R. HORTON is the property owner/developer of record for Tamarron Crossing Phases 1B & Phase 3 Landscape Improvements, per its TDLR project registration.

Who is the architect or design firm for Tamarron Crossing Phases 1B & Phase 3 Landscape Improvements?

KGA DeForest Design, LLC is the design firm of record for Tamarron Crossing Phases 1B & Phase 3 Landscape Improvements, according to its TDLR filing.

How much does Tamarron Crossing Phases 1B & Phase 3 Landscape Improvements cost and how big is it?

Tamarron Crossing Phases 1B & Phase 3 Landscape Improvements has an estimated construction value of $832K and approximately 205,000 square feet (about $4/sqft), based on its TDLR filing.

Scope of Work

Sidewalk, Landscape, Irrigation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Tamarron Crossing & Woods Road/Jordan Ranch Blvd, Fulshear, TX, 77441

Location by street address

Watch all construction in 77441 (Fulshear)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Fulshear?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.