Funding type
This project is privately funded, on private land for private use.
Rally Northgate 2 in Mcallen, TX
9200 N. 10th Street, Mcallen, TX, 78504
Rally Northgate 2 is a new construction project at 9200 N. 10th Street, Mcallen, in Hidalgo County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $12.0M across about 25,926 sq ft.
- Estimated project value
- $12.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 25,926 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $463/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
28 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
385 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Rally Northgate 2
Rally Credit Union is constructing a new administration building at 9200 N. 10th Street in McAllen, Texas. The project, filed as Rally Northgate 2, involves 25,926 square feet of new construction with an estimated cost of $12,000,000. This investment represents a significant addition to the credit union's portfolio in Hidalgo County, where the median new construction cost is $664,320.
The scope of work includes offices, cubicles, a conference room, breakrooms, and restrooms. At $463 per square foot, the project’s cost per unit area is above the county median of $100 per square foot. The scheduled build window of 385 days is longer than the county median of 212 days for similar filings.
Rally Credit Union is the owner and developer of record for this privately funded project on private land. The credit union has five other TDLR-registered projects totaling $6,155,000 in various Texas locations, including McAllen, Alamo, Harlingen, Rockport, and Palmhurst. Most of these previous projects are closed, with one in Fulton showing an inspection complete.
Steve R Zoerner is the registered accessibility specialist for this project. TDLR completed plan review in July 2025, and construction was scheduled to begin in August 2025. The filing lists an August 2026 completion date. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.
This development takes place in ZIP code 78504, a census area with a population of about 61,816 and a median household income of $77,627. The area has 21,417 housing units, with a median owner-occupied home value of $203,900. Other registered projects in the immediate vicinity include new construction for Freddy Gonzalez Dr. and Closner Blvd. and a renovation for Cavender's in Edinburg.
Project Context
The project is part of a broader construction activity in Hidalgo County, where 482 new construction projects were registered in the last 24 months. Rally Credit Union’s investment is in the top quarter of estimated costs for new construction in the county. The local labor market shows an unemployment rate of 6.3 percent in August 2026, which is lower than a year earlier.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78504 (Mcallen)
One email per change. Unsubscribe in one click. Privacy.
Rally Northgate 2 is a New Construction project located at 9200 N. 10th Street, Mcallen, TX 78504 in Mcallen, Texas. The project has an estimated value of $12.0M covering 25,926 sq ft. Rally Credit Union is the property owner. The project was registered with TDLR on July 14, 2025.
Frequently Asked Questions
Is the Rally Credit Union building in McAllen open?
The TDLR record shows construction was scheduled to finish in August 2026, but TDLR has not yet recorded a final inspection. Therefore, the public record does not confirm that the building is open or operating.
How much is the Rally Credit Union project in McAllen worth?
The estimated cost for the new administration building is $12,000,000. This amount is above the median estimated cost for new construction projects in Hidalgo County, which is $664,320.
Who is building the new Rally Credit Union facility?
Rally Credit Union is the owner and developer of record. Steve R Zoerner is the registered accessibility specialist for the project, which is located at 9200 N. 10th Street in McAllen.
What is the size of the new Rally Credit Union building?
The new administration building is 25,926 square feet. This is larger than the median size of 6,000 square feet for new construction projects in Hidalgo County.
When was the Rally Credit Union project registered with TDLR?
The project was registered with TDLR in July 2025. Plan review was completed in the same month, and construction was scheduled to start in August 2025.
What is Rally Northgate 2?
Rally Northgate 2 is a new construction project at 9200 N. 10th Street in Mcallen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Administration building containing offices, cubicles, conference room, breakrooms, and restrooms.
Is Rally Northgate 2 open in Mcallen?
Rally Northgate 2 was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Rally Northgate 2 located?
Rally Northgate 2 is located at 9200 N. 10th Street, Mcallen, TX, 78504, in Hidalgo County.
Who is the owner or developer of Rally Northgate 2?
Rally Credit Union is the property owner/developer of record for Rally Northgate 2, per its TDLR project registration.
How much does Rally Northgate 2 cost and how big is it?
Rally Northgate 2 has an estimated construction value of $12.0M and approximately 25,926 square feet (about $463/sqft), based on its TDLR filing.
Scope of Work
New Administration building containing offices, cubicles, conference room, breakrooms, and restrooms.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
9200 N. 10th Street, Mcallen, TX, 78504
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 78504 (Mcallen)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Mcallen?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.