AISD Renovations at Bryker Woods Elementary School
AISD Renovations at Bryker Woods Elementary School is a renovation/alteration project at 3309 Kerbey Lane, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2026. The project has an estimated value of $3.2M across about 15,000 sq ft.
๐Project Metrics
TDLR #TABS2025023756Review Complete
Design review complete, construction may proceed
AISD Renovations at Bryker Woods Elementary School is a Renovation/Alteration project located at 3309 Kerbey Lane, Austin, TX 78703 in Austin, Texas. The project has an estimated value of $3.2M covering 15,000 sq ft. Austin Independent School District is the property owner and Fuse Architecture Studio is the design firm of record. The project was registered with TDLR on July 17, 2025.
โFrequently Asked Questions
What is AISD Renovations at Bryker Woods Elementary School?
AISD Renovations at Bryker Woods Elementary School is a renovation/alteration project at 3309 Kerbey Lane in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The scope includes replacing rooftop mechanical units, replacing (3) electrical panels, replacing door hardware in (2) areas, and replacing exterior windows as prioritized by Austin ISD.
Is AISD Renovations at Bryker Woods Elementary School open in Austin?
AISD Renovations at Bryker Woods Elementary School is still under construction in Austin, TX, with an estimated completion of Aug 2026 according to its TDLR registration.
Where is AISD Renovations at Bryker Woods Elementary School located?
AISD Renovations at Bryker Woods Elementary School is located at 3309 Kerbey Lane, Austin, TX, 78703, in Travis County.
Who is the owner or developer of AISD Renovations at Bryker Woods Elementary School?
Austin Independent School District is the property owner/developer of record for AISD Renovations at Bryker Woods Elementary School, per its TDLR project registration.
Who is the architect or design firm for AISD Renovations at Bryker Woods Elementary School?
Fuse Architecture Studio is the design firm of record for AISD Renovations at Bryker Woods Elementary School, according to its TDLR filing.
How much does AISD Renovations at Bryker Woods Elementary School cost and how big is it?
AISD Renovations at Bryker Woods Elementary School has an estimated construction value of $3.2M and approximately 15,000 square feet (about $210/sqft), based on its TDLR filing.
๐Scope of Work
The scope includes replacing rooftop mechanical units, replacing (3) electrical panels, replacing door hardware in (2) areas, and replacing exterior windows as prioritized by Austin ISD.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 17, 2025
Review Complete
Jul 17, 2025
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$2.13B total๐Related City Permits
Building permits found at or near this location
Installation GENERAC 22 KW AIR-COOLED STANDBY GENERATOR (MODEL #G007260-0)
HVAC replacement - Building B
HVAC Electrical panel and window replacement - Building A
HVAC Electrical panel and window replacement - Building A
HVAC replacement - Building B Overcurrent devices other than supplementary overcurrent protection shall not be located in bathrooms showering facilities or locker rooms with showering facilities. Reference 2023 NEC 240.24 (E).