AISD Renovations at Bryker Woods Elementary School
๐Project Metrics
TDLR #TABS2025023756Review Complete
Design review complete, construction may proceed
๐Scope of Work
The scope includes replacing rooftop mechanical units, replacing (3) electrical panels, replacing door hardware in (2) areas, and replacing exterior windows as prioritized by Austin ISD.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$72.7M total๐Related City Permits
Building permits found at or near this location
Level 2 EV Charger powered by a 60amp Circuit Breaker. Run #6 THHN c.u. & #10 THHN c.u. ground through <60 feet New 3/4ยฟ EMT conduit approx. to power the Level 2 EV Charger at 48amp constant draw.
*Partial demo* Addition/remodel. Addition of a mud room and wood deck landing with stairs to rear of existing noncomplying 1-story SFR. Comprehensive interior remodel. Reconfigure interior layout resulting in a 4 bedroom 3 bathroom residence.
*Partial demo* Addition/remodel. Addition of a mud room and wood deck landing with stairs to rear of existing noncomplying 1-story SFR. Comprehensive interior remodel. Reconfigure interior layout resulting in a 4 bedroom 3 bathroom residence.
*Partial demo* Addition/remodel. Addition of a mud room and wood deck landing with stairs to rear of existing noncomplying 1-story SFR. Comprehensive interior remodel. Reconfigure interior layout resulting in a 4 bedroom 3 bathroom residence.
Temporary Pole for temporary electrical construction power during a residential remodel. reference bp 2020-101999
๐Related Site Plans
City of Austin site plan approvals at this location