Flintrock Effluent Improvements Phase III
๐Project Metrics
TDLR #TABS2025023947Review Complete
Design review complete, construction may proceed
๐Scope of Work
Effluent pump station with associated improvements. The project will consist of an approximate 2,845-sqft building. This project and associated improvements will be a municipal pump station and will not be open to the public and will be unoccupied.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Install new 15.300 kw rooftop solar system and 13.5 kw energy storage system for existing residential only.
Interior remodel with structural wall modifications. Express permit with EP and MP previously issued for exploratory purposes as remodel was completed by previous tenants without permits. All electrical and mechanical work required will be done as part of the express permit (#2025-112062 BP/EP/MP)
Express - Exploratory demolition to determine scope of work completed by previous residents in order to prepare for submission of an interior remodel application. Complete rewiring for electrical. New HVAC and duck work.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton Vertical Gas
Cap off of Water & Wastewater for a Total demo of SFR 1662 SqFt circa 1958