HPS Rosenberg Primary School is a new construction project at Spacek Rd, Rosenberg, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2027. The project has an estimated value of $22.1M across about 54,945 sq ft.
- Estimated project value
- $22.1M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 54,945 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $402/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 7mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
130 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
577 days after the preceding date shown.
Source: TDLR filing
View source record
📰About HPS Rosenberg Primary School
HPS Rosenberg Primary School is a new 54,945 sq ft facility under construction on Spacek Rd in Rosenberg, Texas. The project is registered with TDLR and is scheduled to finish in July 2027. This new construction effort represents a significant addition to the local educational infrastructure in Fort Bend County.
The building scope includes classrooms, a cafeteria, and a gymnasium. It is Phase I of a broader campus plan. The estimated cost for this phase is $22,100,000. This places the project in the top quarter of estimated costs for new construction filings in the county, which has a median of $700,000.
Cosmos Foundation Inc serves as the owner of record. Huitt-Zollars is the design firm responsible for the project. Kenneth Otten is the registered accessibility specialist. The project involves public funds and public land. TDLR completed plan review in July 2025.
Construction is set to begin in December 2025. The scheduled build window is 577 days. This is longer than the county median build window of 201 days. The cost per square foot is $402, which is above the county median of $100 per square foot.
Rosenberg is located in Fort Bend County. The area has a population of about 65,159. The median household income is $101,546. The median owner-occupied home value is $315,000. Housing in the area is predominantly owner-occupied. Nearby businesses include Valiant Martial Arts and Drabek Farms.
Fort Bend County unemployment rate was 5.1 percent in June 2026. This is higher than a year earlier. The project is part of a larger trend of new construction in the region. Other registered projects in the area include Rosenberg Storage and Fort Bend County MUD 151. Huitt-Zollars has six other registered projects totaling $53,321,735.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77469 (Rosenberg)
One email per change. Unsubscribe in one click. Privacy.
HPS Rosenberg Primary School is a New Construction project located at Spacek Rd, Rosenberg, TX 77469 in Rosenberg, Texas. The project has an estimated value of $22.1M covering 54,945 sq ft. Cosmos Foundation Inc is the property owner and Huitt-Zollars is the design firm of record. The project was registered with TDLR on July 24, 2025.
Frequently Asked Questions
When is the school scheduled to finish?
The project is scheduled to finish in July 2027. Construction is set to begin in December 2025.
What is the estimated cost of the project?
The estimated cost is $22,100,000. This is in the top quarter of new construction filings in Fort Bend County.
Who is the owner of the project?
Cosmos Foundation Inc is the owner of record. Huitt-Zollars is the design firm.
What is included in the building scope?
The scope includes classrooms, a cafeteria, and a gymnasium. It is Phase I of a campus plan.
Is the project using public funds?
Yes, the project involves public funds and public land. It is registered with TDLR.
What is HPS Rosenberg Primary School?
HPS Rosenberg Primary School is a new construction project at Spacek Rd in Rosenberg, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Phase I of a Campus plan to include 54,945 sq ft Primary school, whoch contains classrooms, a cafeteria and a gym
Is HPS Rosenberg Primary School open in Rosenberg?
HPS Rosenberg Primary School is still under construction in Rosenberg, TX, with an estimated completion of Jul 2027 according to its TDLR registration.
Where is HPS Rosenberg Primary School located?
HPS Rosenberg Primary School is located at Spacek Rd, Rosenberg, TX, 77469, in Fort Bend County.
Who is the owner or developer of HPS Rosenberg Primary School?
Cosmos Foundation Inc is the property owner/developer of record for HPS Rosenberg Primary School, per its TDLR project registration.
Who is the architect or design firm for HPS Rosenberg Primary School?
Huitt-Zollars is the design firm of record for HPS Rosenberg Primary School, according to its TDLR filing.
How much does HPS Rosenberg Primary School cost and how big is it?
HPS Rosenberg Primary School has an estimated construction value of $22.1M and approximately 54,945 square feet (about $402/sqft), based on its TDLR filing.
Scope of Work
Phase I of a Campus plan to include 54,945 sq ft Primary school, whoch contains classrooms, a cafeteria and a gym
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Spacek Rd, Rosenberg, TX, 77469
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 77469 (Rosenberg)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Rosenberg?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.