Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Beeville AC Jones High School Auditorium Renovation
1902 N Adams St, Beeville, TX, 78102
Beeville AC Jones High School Auditorium Renovation is a renovation/alteration project at 1902 N Adams St, Beeville, in Bee County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Nov 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $3.1M across about 11,380 sq ft.
- Estimated project value
- $3.1M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 11,380 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $272/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 3mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
344 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
100 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Beeville AC Jones High School Auditorium Renovation
The Beeville AC Jones High School Auditorium Renovation is a $3,090,746 project located at 1902 N Adams St in Beeville, Bee County. This renovation and alteration effort covers 11,380 sq ft of space within the existing school facility. The work involves renovating the auditorium, a significant upgrade for the Bee County campus.
Beeville ISD is the owner of record for this project, which is part of a broader portfolio of five other TDLR-registered projects totaling $8,275,850. Pfluger Architects serves as the design firm of record. The estimated cost per square foot is $272. This figure is above the county median of $100 per square foot for similar renovation and alteration filings in Bee County.
Project Scale and Timeline
The scheduled build window for this project is 444 days. This duration is longer than the county median of 104 days for comparable work. Construction was scheduled to start in August 2024, with a completion date listed as November 2025. The project involves public funds and public land. TDLR completed plan review in July 2025. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.
This classification indicates a lower risk of flooding compared to areas within the designated floodplain. The project is registered with TDLR, and the accessibility specialist of record is Timothy D Westphal. The registration status is Review Complete, reflecting the administrative progress of the filing.
For context, the Beeville area has a population of about 27,000 according to U.S. Census ACS 2023 five-year estimates for ZIP 78102. The median household income in this area is $59,591. Nearby businesses include Walmart Supercenter, Advance America, and Beeville Veterinary Hospital. The presence of these establishments indicates a stable local commercial environment surrounding the school campus.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78102 (Beeville)
One email per change. Unsubscribe in one click. Privacy.
Beeville AC Jones High School Auditorium Renovation is a Renovation/Alteration project located at 1902 N Adams St in Beeville, Texas. The project has an estimated value of $3.1M covering 11,380 sq ft. Beeville ISD is the property owner and Pfluger Architects is the design firm of record. The project was registered with TDLR on July 24, 2025.
Frequently Asked Questions
What is the current status of the Beeville AC Jones High School auditorium renovation?
TDLR completed plan review in July 2025. The scheduled completion date was November 2025. However, TDLR has not yet recorded a final inspection, so the site's final state is not confirmed in the public record.
Who is the design firm for this project?
Pfluger Architects is the design firm of record for the Beeville AC Jones High School Auditorium Renovation. They are responsible for the architectural planning of this $3,090,746 project.
How much does the renovation cost per square foot?
The estimated cost is $3,090,746 for 11,380 sq ft, resulting in a cost of $272 per square foot. This is above the Bee County median of $100 per square foot for similar renovation filings.
Is the school building open to the public?
The facts provided cover construction status only. TDLR has not yet recorded a final inspection. There is no information in the record confirming that the business or facility is open or operating.
Where is the project located?
The project is located at 1902 N Adams St in Beeville, Bee County, Texas.
What is Beeville AC Jones High School Auditorium Renovation?
Beeville AC Jones High School Auditorium Renovation is a renovation/alteration project at 1902 N Adams St in Beeville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovating auditorium.
Is Beeville AC Jones High School Auditorium Renovation open in Beeville?
Beeville AC Jones High School Auditorium Renovation was scheduled to finish construction in Nov 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Beeville AC Jones High School Auditorium Renovation located?
Beeville AC Jones High School Auditorium Renovation is located at 1902 N Adams St, Beeville, TX, 78102, in Bee County.
Who is the owner or developer of Beeville AC Jones High School Auditorium Renovation?
Beeville ISD is the property owner/developer of record for Beeville AC Jones High School Auditorium Renovation, per its TDLR project registration.
Who is the architect or design firm for Beeville AC Jones High School Auditorium Renovation?
Pfluger Architects is the design firm of record for Beeville AC Jones High School Auditorium Renovation, according to its TDLR filing.
How much does Beeville AC Jones High School Auditorium Renovation cost and how big is it?
Beeville AC Jones High School Auditorium Renovation has an estimated construction value of $3.1M and approximately 11,380 square feet (about $272/sqft), based on its TDLR filing.
Scope of Work
Renovating auditorium.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1902 N Adams St, Beeville, TX, 78102
Related Projects
Same Owner
$65.1M totalNearby Projects
Within 0.6 miWatch all construction in 78102 (Beeville)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Beeville?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.