Project intelligenceTDLR TABS2025024353New Construction
Funding type

This project is privately funded, on private land for private use.

Pecan Plaza - Lot 5 in Northlake, TX

8048 Cleveland Gibbs Rd, Northlake, TX, 76226

Target date passed (May 2026)Project Registered

Pecan Plaza - Lot 5 is a new construction project at 8048 Cleveland Gibbs Rd, Northlake, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish May 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $468K across about 5,510 sq ft.

Estimated project value
$468K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,510 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$85/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 25, 2025280 days across supplied datesMay 1, 2026

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    38 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    242 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Pecan Plaza - Lot 5

A new 5,510 sq ft shell building is planned for 8048 Cleveland Gibbs Rd in Northlake, Texas. The project, identified as Pecan Plaza - Lot 5, is a new construction effort with an estimated cost of $468,350. This valuation places the project below the Denton County median for similar new construction filings, which stands at $900,000. The estimated cost per square foot is $85, also below the county median of $121 per square foot.

Project Details and Ownership

Office Equity Solutions is the owner of record for this development. The design firm of record is KlineHardin. The registered accessibility specialist for the project is Grady Gammons. The work is privately funded on private land for private use. The project was registered with TDLR in July 2025. The filing indicates a construction start date of September 2025 and a target completion date of May 2026. The scheduled build window of 242 days is close to the county median of 219 days.

The area, corresponding to ZIP code 76226, has a Census-estimated population of about 40,516 and a median household income of $170,530. Housing in this ZIP code is predominantly owner-occupied, with a median home value of $554,900. Nearby businesses include Dumont Creamery & Cafe, Ranch Nails & Spa, Donut Space, Le Rich MedSpa, LLC, and Marco's Pizza.

Office Equity Solutions has six other TDLR-registered projects totaling $2,765,050. These include Pecan Plaza - Lot 6 in Northlake, projects in Keller and Justin, and a closed project in Justin. KlineHardin, the design firm, has six other registered projects totaling $3,490,425, including work in Arlington, Northlake, Justin, Anna, and Lewisville. Other registered projects in the immediate area include The Ridge West - Building 3, Harvest Town Center, HEB Robson Ranch FSCW, Bank of America, and Harvest Commercial Corner.

Current Status

The TDLR status for this project is listed as Project Registered. Although the target completion date of May 2026 has passed, the public record does not confirm whether construction proceeded. No plan review or inspection has been recorded since the initial registration. A third-party mention from town.northlake.tx.us describes a site plan consideration for a 5,510-square-foot commercial building on a 0.73-acre lot, consistent with the TDLR filing details. The Denton County unemployment rate was 4.3 percent in July 2026, higher than a year earlier.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76226 (Northlake)

One email per change. Unsubscribe in one click. Privacy.

Pecan Plaza - Lot 5 is a New Construction project located at 8048 Cleveland Gibbs Rd, Northlake, TX 76226 in Northlake, Texas. The project has an estimated value of $468K covering 5,510 sq ft. Office Equity Solutions is the property owner and KlineHardin is the design firm of record. The project was registered with TDLR on July 25, 2025.

Frequently Asked Questions

Is Pecan Plaza - Lot 5 open for business?

The TDLR record does not confirm that the business is open. The project status is Project Registered, and no plan review or inspection has been recorded. The target completion date of May 2026 has passed, but construction status is not confirmed in the public record.

Who is the owner of Pecan Plaza - Lot 5?

The owner of record for this project is Office Equity Solutions. The design firm of record is KlineHardin, and the registered accessibility specialist is Grady Gammons.

What is the estimated cost of this building?

The estimated cost for the new shell building is $468,350. This figure is below the Denton County median estimated cost of $900,000 for new construction filings.

Where is Pecan Plaza - Lot 5 located?

The project is located at 8048 Cleveland Gibbs Rd, Northlake, TX 76226.

When was the project registered with TDLR?

The project was registered with TDLR in July 2025. The filing indicated a construction start of September 2025 and a target completion of May 2026.

What is Pecan Plaza - Lot 5?

Pecan Plaza - Lot 5 is a new construction project at 8048 Cleveland Gibbs Rd in Northlake, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Shell Building

Is Pecan Plaza - Lot 5 open in Northlake?

Pecan Plaza - Lot 5 was scheduled to finish construction in May 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Who is the owner or developer of Pecan Plaza - Lot 5?

Office Equity Solutions is the property owner/developer of record for Pecan Plaza - Lot 5, per its TDLR project registration.

Who is the architect or design firm for Pecan Plaza - Lot 5?

KlineHardin is the design firm of record for Pecan Plaza - Lot 5, according to its TDLR filing.

How much does Pecan Plaza - Lot 5 cost and how big is it?

Pecan Plaza - Lot 5 has an estimated construction value of $468K and approximately 5,510 square feet (about $85/sqft), based on its TDLR filing.

Scope of Work

New Shell Building

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

8048 Cleveland Gibbs Rd, Northlake, TX, 76226

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76226 (Northlake)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Northlake?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.