Lake Travis High School No. 2
Reimer’s-Peacock Rd., Spicewood, TX, 78669
Lake Travis High School No. 2 is a new construction project at Reimer’s-Peacock Rd., Spicewood, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2028. The project has an estimated value of $300.0M across about 500,000 sq ft.
- Estimated project value
- $300.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 500,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $600/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 2mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
230 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
76 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
792 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Lake Travis High School No. 2
Lake Travis High School No. 2 is a new 500,000-square-foot campus under construction in Spicewood, Texas. The project represents a significant expansion for the district, with an estimated cost of $300,000,000. This development is scheduled to finish in August 2028, following a construction start date of June 2026. The scope includes a full academic and athletic complex designed to serve the growing student population in the area.
The site, located at Reimer’s-Peacock Rd. in Travis County, features a comprehensive layout. The new campus includes a dedicated academics building, a fine arts facility, and an athletics building. Additionally, the project encompasses a competition stadium, multiple athletics fields, and associated outbuildings. The total area covers 500,000 square feet, resulting in a computed cost of $600 per square foot. This figure is above the county median for new construction projects, reflecting the specialized nature of the educational and athletic infrastructure being built.
Project Scope and Design
VLK serves as the design firm of record for this major undertaking. The registered accessibility specialist is Kathy Ann Riley, ensuring the facility meets all necessary standards for student access. The project involves public funds and public land, highlighting its importance to the local community. TDLR completed the plan review process in March 2026, clearing the path for physical construction to begin in the summer. The registration with TDLR was established in July 2025, marking the start of the formal oversight process for this large-scale build.
The construction window is scheduled for 792 days, a period longer than the median build window for similar projects in Travis County. This extended timeline allows for the complex coordination required for stadium and field construction alongside standard academic buildings. Lake Travis Independent School District is the owner of record, overseeing the development. The district has other TDLR-registered projects, but this new high school campus is the largest by estimated cost in its recent filings. The project stands out for its scale and the specific mix of academic and recreational facilities included in the single development.
Local Context and Comparison
Spicewood is a community in Travis County with a median household income of $126,422 according to U.S. Census estimates. The area has a population of approximately 11,980, with housing predominantly owner-occupied. The new high school will serve this growing local population. The project's cost and size place it in the top quarter of new construction filings in the county. This indicates a significant investment in educational infrastructure for the region. The design and construction phases are proceeding according to the filed schedule, with the final completion date set for August 2028.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78669 (Spicewood)
One email per change. Unsubscribe in one click. Privacy.
Lake Travis High School No. 2 is a New Construction project located at Reimer’s-Peacock Rd., Spicewood, TX 78669 in Spicewood, Texas. The project has an estimated value of $300.0M covering 500,000 sq ft. Lake Travis Independent School District is the property owner and VLK is the design firm of record. The project was registered with TDLR on July 30, 2025.
Frequently Asked Questions
When is Lake Travis High School No. 2 scheduled to finish construction?
The project is scheduled to finish in August 2028. Construction is set to begin in June 2026, following the completion of plan review in March 2026.
Who is the design firm for the new Spicewood high school?
VLK is the design firm of record for the Lake Travis High School No. 2 project. They are responsible for the architectural and engineering design of the campus.
What is the estimated cost of the new high school campus?
The estimated cost for the Lake Travis High School No. 2 project is $300,000,000. This covers the new buildings, stadium, fields, and sitework.
Is the new high school in Spicewood currently open?
The project is under construction and is not yet open. It is scheduled to finish in August 2028, with work starting in June 2026.
What facilities are included in the new campus scope?
The scope includes a new academics building, fine arts building, athletics building, competition stadium, athletics fields, and associated outbuildings.
What is Lake Travis High School No. 2?
Lake Travis High School No. 2 is a new construction project at Reimer’s-Peacock Rd. in Spicewood, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New High School Campus including new academics building, fine arts building, athletics building, competition stadium, athletics fields, associated outbuildings and sitework.
Is Lake Travis High School No. 2 open in Spicewood?
Lake Travis High School No. 2 is still under construction in Spicewood, TX, with an estimated completion of Aug 2028 according to its TDLR registration.
Where is Lake Travis High School No. 2 located?
Lake Travis High School No. 2 is located at Reimer’s-Peacock Rd., Spicewood, TX, 78669, in Travis County.
Who is the owner or developer of Lake Travis High School No. 2?
Lake Travis Independent School District is the property owner/developer of record for Lake Travis High School No. 2, per its TDLR project registration.
Who is the architect or design firm for Lake Travis High School No. 2?
VLK is the design firm of record for Lake Travis High School No. 2, according to its TDLR filing.
How much does Lake Travis High School No. 2 cost and how big is it?
Lake Travis High School No. 2 has an estimated construction value of $300.0M and approximately 500,000 square feet (about $600/sqft), based on its TDLR filing.
Scope of Work
New High School Campus including new academics building, fine arts building, athletics building, competition stadium, athletics fields, associated outbuildings and sitework.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Reimer’s-Peacock Rd., Spicewood, TX, 78669
Related Projects
Same Owner
$622.1M totalWatch all construction in 78669 (Spicewood)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Spicewood?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.