Overton Park Covered Parking Structure
2210 Glenna Goodacre Blvd, Lubbock, TX, 79401
Overton Park Covered Parking Structure is a new construction project at 2210 Glenna Goodacre Blvd, Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Nov 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $240K across about 8,610 sq ft.
- Estimated project value
- $240K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 8,610 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $28/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
32 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
61 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79401 (Lubbock)
One email per change. Unsubscribe in one click. Privacy.
Overton Park Covered Parking Structure is a New Construction project located at 2210 Glenna Goodacre Blvd, Lubbock, TX 79401 in Lubbock, Texas. The project has an estimated value of $240K covering 8,610 sq ft. ACC OP (TRACT 6) LLC is the property owner and JDMA Architects is the design firm of record. The project was registered with TDLR on July 31, 2025.
Frequently Asked Questions
What is Overton Park Covered Parking Structure?
Overton Park Covered Parking Structure is a new construction project at 2210 Glenna Goodacre Blvd in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The construction of (4) covered parking structures. Total of 8610sf
Is Overton Park Covered Parking Structure open in Lubbock?
Overton Park Covered Parking Structure was scheduled to finish construction in Nov 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Overton Park Covered Parking Structure located?
Overton Park Covered Parking Structure is located at 2210 Glenna Goodacre Blvd, Lubbock, TX, 79401, in Lubbock County.
Who is the owner or developer of Overton Park Covered Parking Structure?
ACC OP (TRACT 6) LLC is the property owner/developer of record for Overton Park Covered Parking Structure, per its TDLR project registration.
Who is the architect or design firm for Overton Park Covered Parking Structure?
JDMA Architects is the design firm of record for Overton Park Covered Parking Structure, according to its TDLR filing.
How much does Overton Park Covered Parking Structure cost and how big is it?
Overton Park Covered Parking Structure has an estimated construction value of $240K and approximately 8,610 square feet (about $28/sqft), based on its TDLR filing.
Scope of Work
The construction of (4) covered parking structures. Total of 8610sf
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2210 Glenna Goodacre Blvd, Lubbock, TX, 79401
Related Projects
Watch all construction in 79401 (Lubbock)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Lubbock?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.