Driskill Hotel Room Refresh Phase 2 is a renovation/alteration project at 604 Brazos St, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $4.2M across about 35,500 sq ft.
Design review complete, construction may proceed
Driskill Hotel Room Refresh Phase 2 is a Renovation/Alteration project located at 604 Brazos St, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $4.2M covering 35,500 sq ft. Woodbine Development is the property owner and Clayton Korte is the design firm of record. The project was registered with TDLR on July 31, 2025.
Driskill Hotel Room Refresh Phase 2 is a renovation/alteration project at 604 Brazos St in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of 65 guestrooms and corridors in the original hotel portion of the building.
Driskill Hotel Room Refresh Phase 2 is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Driskill Hotel Room Refresh Phase 2 is located at 604 Brazos St, Austin, TX, 78701, in Travis County.
Woodbine Development is the property owner/developer of record for Driskill Hotel Room Refresh Phase 2, per its TDLR project registration.
Clayton Korte is the design firm of record for Driskill Hotel Room Refresh Phase 2, according to its TDLR filing.
Driskill Hotel Room Refresh Phase 2 has an estimated construction value of $4.2M and approximately 35,500 square feet (about $117/sqft), based on its TDLR filing.
Interior renovation of 65 guestrooms and corridors in the original hotel portion of the building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jul 31, 2025
Review Complete
Jul 31, 2025
Inspection Complete
Closed
Building permits found at or near this location
UPGRADE 200 AMP SERVICE TO 320 AMP SERVICE
Replacement of complete existing central heat and air system with or without duct work Install replacement of 2 Ton AC with Air Handler
Rebiuld the electrical service Intall a new meter can and a new main panel
2026/03/12 - 2026/03/14 | (2026/03/10 - 2026/03/15) | KAP Media SXSW Projection Site for Fairmont image #SXSWAffiliated
ePlan: Commercial Expedited Review - [AE GREEN BUILDING] Interior Remodel to Existing Hotel. Work to include Remodel of 65 guestrooms and corridors (175 000 SF)