Project intelligenceTDLR TABS2025024957New Construction
Funding type

This project is privately funded, on private land for private use.

22047.C-Bridge Fellowship New Campus in Boerne, TX

109 Ammann Road, Boerne, TX, 78015

Opening ~Jan 2027Review Complete

22047.C-Bridge Fellowship New Campus is a new construction project at 109 Ammann Road, Boerne, in Kendall County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $1.8M across about 47,204 sq ft.

Estimated project value
$1.8M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
47,204 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$38/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 1, 2025519 days across supplied datesJan 2, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    458 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About 22047.C-Bridge Fellowship New Campus

The Bridge Fellowship is constructing a new 47,204 sq ft campus at 109 Ammann Road in Boerne, Kendall County. This new construction project is scheduled to finish in January 2027, with work starting in October 2025. The facility is privately funded on private land for private use.

The scope of work includes a new one-story building featuring a 1,000-seat worship space, administration offices, and a dedicated children and youth area. The estimated cost for this development is $1,800,000, which equates to $38 per square foot. This cost per square foot is below the Kendall County median of $134 for similar new construction filings.

Design and Registration

RVK Architecture, Inc. serves as the design firm of record for the project. The Bridge Boerne dba The Bridge Fellowship is the owner and developer of record. Peter F Grojean is the registered accessibility specialist for this filing. The project was registered with TDLR in August 2025, and plan review was completed in the same month.

The scheduled build window for this project is 458 days, which is longer than the county median of 273 days for new construction. The estimated total cost is above the county median of $705,481 for comparable projects in Kendall County. RVK Architecture, Inc. has six other TDLR-registered projects totaling $8,657,641, including work in Hondo, San Antonio, and Cibolo.

Census estimates for ZIP code 78015 indicate a population of about 23,548 and a median household income of $155,488. The area is predominantly owner-occupied, with a median home value of $482,800. Kendall County unemployment stood at 3.9 percent in July 2026.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78015 (Boerne)

One email per change. Unsubscribe in one click. Privacy.

22047.C-Bridge Fellowship New Campus is a New Construction project located at 109 Ammann Road in Boerne, Texas. The project has an estimated value of $1.8M covering 47,204 sq ft. The Bridge Boerne dba The Bridge Fellowship is the property owner and RVK Architecture, Inc. is the design firm of record. The project was registered with TDLR on August 1, 2025.

Frequently Asked Questions

Where is the new Bridge Fellowship campus located?

The new campus is located at 109 Ammann Road in Boerne, within Kendall County.

What is included in the new building's scope?

The one-story building includes a 1,000-seat worship space, administration offices, and a dedicated children and youth area. The total size is 47,204 sq ft.

Who is the design firm for this project?

RVK Architecture, Inc. is the design firm of record. The owner is The Bridge Boerne dba The Bridge Fellowship.

When is construction scheduled to finish?

Construction is scheduled to finish in January 2027. Work is set to start in October 2025, following plan review completion in August 2025.

Is the Bridge Fellowship currently open?

The TDLR record tracks construction status, not business operations. The project is under construction with a scheduled finish date in January 2027.

What is 22047.C-Bridge Fellowship New Campus?

22047.C-Bridge Fellowship New Campus is a new construction project at 109 Ammann Road in Boerne, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 1-story building with 1,000 seat Worship space, Administration Offices and a Children and Youth space.

Is 22047.C-Bridge Fellowship New Campus open in Boerne?

22047.C-Bridge Fellowship New Campus is still under construction in Boerne, TX, with an estimated completion of Jan 2027 according to its TDLR registration.

Where is 22047.C-Bridge Fellowship New Campus located?

22047.C-Bridge Fellowship New Campus is located at 109 Ammann Road, Boerne, TX, 78015, in Kendall County.

Who is the owner or developer of 22047.C-Bridge Fellowship New Campus?

The Bridge Boerne dba The Bridge Fellowship is the property owner/developer of record for 22047.C-Bridge Fellowship New Campus, per its TDLR project registration.

Who is the architect or design firm for 22047.C-Bridge Fellowship New Campus?

RVK Architecture, Inc. is the design firm of record for 22047.C-Bridge Fellowship New Campus, according to its TDLR filing.

How much does 22047.C-Bridge Fellowship New Campus cost and how big is it?

22047.C-Bridge Fellowship New Campus has an estimated construction value of $1.8M and approximately 47,204 square feet (about $38/sqft), based on its TDLR filing.

Scope of Work

New 1-story building with 1,000 seat Worship space, Administration Offices and a Children and Youth space.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

109 Ammann Road, Boerne, TX, 78015

29.78616, -98.66795

Watch all construction in 78015 (Boerne)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.