Frost Financial Center is a renovation/alteration project at 170 Alliance Blvd, Suite 100, Hutto, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $3.5M across about 3,619 sq ft.
Final inspection completed, awaiting project closure
Frost Financial Center is a Renovation/Alteration project located at 170 Alliance Blvd, Suite 100, Hutto, TX 78634 in Hutto, Texas. The project has an estimated value of $3.5M covering 3,619 sq ft. A-S 64 CR 119 Hwy 79 Phase 2, LP is the property owner and O'Connell Robertson is the design firm of record. The project was registered with TDLR on August 4, 2025.
Frost Financial Center is a renovation/alteration project at 170 Alliance Blvd, Suite 100 in Hutto, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of 3,619 SF of tenant space in a shell retail building.
Construction on Frost Financial Center is complete โ TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
Frost Financial Center is located at 170 Alliance Blvd, Suite 100, Hutto, TX, 78634, in Williamson County.
A-S 64 CR 119 Hwy 79 Phase 2, LP is the property owner/developer of record for Frost Financial Center, per its TDLR project registration.
O'Connell Robertson is the design firm of record for Frost Financial Center, according to its TDLR filing.
Frost Financial Center has an estimated construction value of $3.5M and approximately 3,619 square feet (about $967/sqft), based on its TDLR filing.
Renovation of 3,619 SF of tenant space in a shell retail building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Aug 4, 2025
Review Complete
Aug 4, 2025
Inspection Complete
May 1, 2026
Closed
270d
Construction phase
Building permits found at or near this location
Replacement of an existing water heater
Expedited Review: New Construction of a 2-Story Single Family Res [4bed 3.5bath] with attached 2-Car Garage and Detached Garage with accessory structure above [1bed 1bath] and Pool.
Total demo of sfr 3223 sqft circa 1940
Tenant improvement of a ground floor build-out within an existing mixed-use building for a..
Install a full lawn sprinkler system.