YPO
YPO is a renovation/alteration project at 600 E. Las Colinas Blvd., Suite 1200, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $452K across about 5,710 sq ft.
๐Project Metrics
TDLR #TABS2025025185Review Complete
Design review complete, construction may proceed
YPO is a Renovation/Alteration project located at 600 E. Las Colinas Blvd., Suite 1200, Irving, TX 75039 in Irving, Texas. The project has an estimated value of $452K covering 5,710 sq ft. 600 Las Colinas Owner LLC is the property owner and BHA Studio is the design firm of record. The project was registered with TDLR on August 5, 2025.
โFrequently Asked Questions
What is YPO?
YPO is a renovation/alteration project at 600 E. Las Colinas Blvd., Suite 1200 in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing interior commercial office space.
Is YPO open in Irving?
YPO is currently under construction in Irving, TX. Its current TDLR status is "Review Complete".
Where is YPO located?
YPO is located at 600 E. Las Colinas Blvd., Suite 1200, Irving, TX, 75039, in Dallas County.
Who is the owner or developer of YPO?
600 Las Colinas Owner LLC is the property owner/developer of record for YPO, per its TDLR project registration.
Who is the architect or design firm for YPO?
BHA Studio is the design firm of record for YPO, according to its TDLR filing.
How much does YPO cost and how big is it?
YPO has an estimated construction value of $452K and approximately 5,710 square feet (about $79/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of existing interior commercial office space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 5, 2025
Review Complete
Aug 5, 2025
Inspection Complete
Closed