Project intelligenceTDLR TABS2025025486New Construction
Funding type

This project is privately funded, on private land for private use.

Easton Park 4B East Phase 2 & 3 in Austin, TX

Cota Vista at Finial Drive, Austin, TX, 78744

Target date passed (Jun 2026)Project Registered

Easton Park 4B East Phase 2 & 3 is a new construction project at Cota Vista at Finial Drive, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.4M across about 1 sq ft.

Estimated project value
$2.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$2377.99K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 8, 2025297 days across supplied datesJun 1, 2026

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    54 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    243 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Easton Park 4B East Phase 2 & 3

Easton Park 4B East Phase 2 & 3 is a new construction project in the Bluff Springs area of Austin, specifically at Cota Vista at Finial Drive. The scope of work involves the construction of a new roadway, sidewalk, and ADA ramps. The estimated cost for this infrastructure work is $2,377,989. Brookfield Properties is listed as the owner and developer of record for this private development.

The project was registered with the Texas Department of Licensing and Regulation (TDLR) in August 2025. The filing indicates a target completion date of June 2026. However, no plan review or inspection has been recorded since registration, so whether the project proceeded as scheduled is not confirmed in the public record. The TDLR status remains Project Registered.

Carlson, Brigance and Doering, Inc. is the design firm of record for the project. Jesus E Lardizabal is the registered accessibility specialist. The funding source is private, with the work taking place on private land for private use. The square footage is listed as 1 sq ft, reflecting the nature of the roadway and ramp work rather than a building interior.

Project Context and Comparisons

This project's estimated cost is above the county median for new construction filings in Travis County. The median estimated cost for similar filings is $1,000,000. The scheduled build window of 243 days is close to the county median of 304 days. Brookfield Properties has six other TDLR-registered projects totaling $4,809,500, including locations in Humble, Southlake, San Antonio, and Frisco. The design firm has one other registered project in Austin with a total value of $3,811,513.

Nearby businesses in the area include Fluffy Scooper, Discovery Park, and Pilates with Taylor. The surrounding ZIP code 78744 has a population of about 51,069 and a median household income of $78,474 according to U.S. Census estimates. The housing stock is an even mix of owner- and renter-occupied units. The median owner-occupied home value is $307,000. Travis County unemployment rate was 3.9 percent in July 2026.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78744 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Easton Park 4B East Phase 2 & 3 is a New Construction project located at Cota Vista at Finial Drive, Austin, TX 78744 in Austin, Texas. The project has an estimated value of $2.4M covering 1 sq ft. Brookfield Properties is the property owner and Carlson, Brigance and Doering, Inc. is the design firm of record. The project was registered with TDLR on August 8, 2025.

Frequently Asked Questions

Is Easton Park 4B East Phase 2 & 3 complete?

The filing targeted completion in June 2026, but no plan review or inspection has been recorded. Therefore, the public record does not confirm if the project proceeded or finished on schedule.

Who is building the new roadway and ramps?

Brookfield Properties is the owner of record. Carlson, Brigance and Doering, Inc. is the design firm. Jesus E Lardizabal is the registered accessibility specialist listed in the TDLR filing.

What is the estimated cost of the project?

The estimated cost is $2,377,989. This amount covers the construction of a new roadway, sidewalk, and ADA ramps at the Cota Vista at Finial Drive location in Austin.

Is the business open at this location?

The TDLR record describes construction work only. It does not provide information about business operations or opening dates. No plan review or inspection has been recorded to confirm completion.

What is Easton Park 4B East Phase 2 & 3?

Easton Park 4B East Phase 2 & 3 is a new construction project at Cota Vista at Finial Drive in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a new roadway, sidewalk, and ADA ramps.

Is Easton Park 4B East Phase 2 & 3 open in Austin?

Easton Park 4B East Phase 2 & 3 was scheduled to finish construction in Jun 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Easton Park 4B East Phase 2 & 3 located?

Easton Park 4B East Phase 2 & 3 is located at Cota Vista at Finial Drive, Austin, TX, 78744, in Travis County.

Who is the owner or developer of Easton Park 4B East Phase 2 & 3?

Brookfield Properties is the property owner/developer of record for Easton Park 4B East Phase 2 & 3, per its TDLR project registration.

Who is the architect or design firm for Easton Park 4B East Phase 2 & 3?

Carlson, Brigance and Doering, Inc. is the design firm of record for Easton Park 4B East Phase 2 & 3, according to its TDLR filing.

How much does Easton Park 4B East Phase 2 & 3 cost and how big is it?

Easton Park 4B East Phase 2 & 3 has an estimated construction value of $2.4M and approximately 1 square feet (about $2377.99K/sqft), based on its TDLR filing.

Scope of Work

Construction of a new roadway, sidewalk, and ADA ramps.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Cota Vista at Finial Drive, Austin, TX, 78744

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78744 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.