Project intelligenceTDLR TABS2025025702New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Chaparral Trail - Phase 1, Phase 2, Phase 3 in Farmersville, TX

FM 2194 Hunt County, Farmersville, TX, 75442

Target date passed (Jan 2026)Review Complete

Chaparral Trail - Phase 1, Phase 2, Phase 3 is a new construction project at FM 2194 Hunt County, Farmersville, in Hunt County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jan 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $672K across about 253,440 sq ft.

Estimated project value
$672K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
253,440 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$3/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 12, 2025170 days across supplied datesJan 29, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    20 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    150 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Chaparral Trail - Phase 1, Phase 2, Phase 3

The City of Farmersville is developing the Chaparral Trail, a new recreational facility spanning approximately 6 miles along FM 2194 in Hunt County. The project involves the site construction of an 8-foot wide flex base stabilized trail along an abandoned railroad corridor. The total estimated cost for this new construction is $671,600, covering a site area of 253,440 square feet.

Project Scope and Status

Registered with TDLR in August 2025, the project underwent plan review during the same month. Construction was scheduled to begin in September 2025 with a completion date of January 2026. Although that date has passed, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The registered accessibility specialist for the filing is George A Patterson.

Dunaway is the design firm of record for this development. The project utilizes public funds or land, qualifying it for specific federal roadway project considerations. This classification indicates a lower risk of flooding compared to areas within designated flood zones, which may influence long-term maintenance planning for the stabilized trail surface.

Local Context and Comparison

Compared to 277 other new construction filings in Hunt County, this project’s estimated cost of $671,600 is below the county median of $850,000. The scheduled build window of 150 days is shorter than the county median of 225 days. The cost per square foot is $3, which is significantly below the county median of $170 per square foot. These figures reflect the linear nature of the trail construction rather than a traditional building footprint.

The City of Farmersville has one other TDLR-registered project totaling $328,750, which is already closed. Dunaway, the design firm, has six other registered projects totaling $36,526,998 across various Texas locations, including Dallas and Midland. The surrounding area, ZIP code 75442, has a population of about 10,567 with a median household income of $84,591. Housing in this area is predominantly owner-occupied, with a median home value of $330,000 according to U.S. Census estimates.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75442 (Farmersville)

One email per change. Unsubscribe in one click. Privacy.

Chaparral Trail - Phase 1, Phase 2, Phase 3 is a New Construction project located at FM 2194 Hunt County in Farmersville, Texas. The project has an estimated value of $672K covering 253,440 sq ft. City of Farmersville is the property owner and Dunaway is the design firm of record. The project was registered with TDLR on August 12, 2025.

Frequently Asked Questions

Is the Chaparral Trail open to the public?

The TDLR record shows construction was scheduled to finish in January 2026, but the agency has not yet recorded a final inspection. The public record does not confirm whether the trail is open or operational.

Who is building the Chaparral Trail in Farmersville?

The City of Farmersville is the owner of record. Dunaway is the design firm, and George A Patterson is the registered accessibility specialist. The project involves new construction of a recreational trail along an abandoned railroad corridor.

How long is the Chaparral Trail?

The project consists of approximately 6 miles of an 8-foot wide flex base stabilized recreational trail. This length is specified in the scope of work from the TDLR filing for the new construction project.

What is the estimated cost of the Chaparral Trail project?

The estimated cost for the Chaparral Trail project is $671,600. This figure covers the site construction of the trail along the abandoned railroad corridor in Hunt County, as stated in the project filing.

Is the site located in a flood zone?

It is classified as zone X, which indicates it is not within the designated high-risk flood area for the 100-year flood event.

What is Chaparral Trail - Phase 1, Phase 2, Phase 3?

Chaparral Trail - Phase 1, Phase 2, Phase 3 is a new construction project at FM 2194 Hunt County in Farmersville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project consists of site construction of approximately 6 miles of an 8’ wide flex base stabilized recreational trail along an abandoned railroad corridor as indicated in the Contract Document.

Is Chaparral Trail - Phase 1, Phase 2, Phase 3 open in Farmersville?

Chaparral Trail - Phase 1, Phase 2, Phase 3 was scheduled to finish construction in Jan 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Chaparral Trail - Phase 1, Phase 2, Phase 3 located?

Chaparral Trail - Phase 1, Phase 2, Phase 3 is located at FM 2194 Hunt County, Farmersville, TX, 75442, in Hunt County.

Who is the owner or developer of Chaparral Trail - Phase 1, Phase 2, Phase 3?

City of Farmersville is the property owner/developer of record for Chaparral Trail - Phase 1, Phase 2, Phase 3, per its TDLR project registration.

Who is the architect or design firm for Chaparral Trail - Phase 1, Phase 2, Phase 3?

Dunaway is the design firm of record for Chaparral Trail - Phase 1, Phase 2, Phase 3, according to its TDLR filing.

How much does Chaparral Trail - Phase 1, Phase 2, Phase 3 cost and how big is it?

Chaparral Trail - Phase 1, Phase 2, Phase 3 has an estimated construction value of $672K and approximately 253,440 square feet (about $3/sqft), based on its TDLR filing.

Scope of Work

Project consists of site construction of approximately 6 miles of an 8’ wide flex base stabilized recreational trail along an abandoned railroad corridor as indicated in the Contract Document.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

FM 2194 Hunt County, Farmersville, TX, 75442

Loading location map…
33.11616, -96.08089

Watch all construction in 75442 (Farmersville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Farmersville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.