Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
COH WBS No. S-000035-0270-3 in Houston, TX
Second Ward Area, Houston, TX, 77003
COH WBS No. S-000035-0270-3 is a renovation/alteration project at Second Ward Area, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $13.6M across about 47,195 sq ft.
- Estimated project value
- $13.6M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 47,195 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $287/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 7 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
270 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
214 days after the preceding date shown.
Source: TDLR filing
View source record
📰About COH WBS No. S-000035-0270-3
The City of Houston is replacing water lines in the Second Ward, a project valued at $13,561,528. This renovation/alteration spans 47,195 square feet of infrastructure work within the 77003 ZIP code. The project is registered under the name COH WBS No. S-000035-0270-3, with Woolpert, Inc. serving as the design firm of record. David S Drepaul is the registered accessibility specialist for this filing.
TDLR completed plan review in August 2025 and construction is scheduled to finish in December 2026, with work starting May 2026. The status is marked as Review Complete. This timeline represents a 214-day scheduled build window, which is longer than the 92-day median for similar renovations in Harris County. The estimated cost of $13,561,528 places the project in the top quarter of cost for renovation filings in the county, significantly above the median of $250,000.
Project Scope and Location
The scope of work is defined specifically as COH water line replacement. The site is located in the Second Ward Area of Houston, Harris County. The project involves public funds, public land, or is a Federally funded roadway project. Woolpert, Inc. has one other TDLR-registered project in Houston, a water line replacement valued at $16,100,000, which is also marked as review complete.
Nearby businesses include Moon Tower Inn, El Tiempo Cantina, Villa Arcos, Subway, Natural Resources Salon, and OWDT. The surrounding area, according to U.S. Census ACS 2023 five-year estimates for ZIP 77003, has a population of about 9,721 and a median household income of $88,837. Housing in this area is an even mix of owner- and renter-occupied, with a median owner-occupied home value of $363,000.
The City of Houston holds six other TDLR-registered projects totaling $10,332,655 in the same county. These include HFD Fire Station 22, Trinity Gardens Park, COH SWD NE Service Center, and two phases of Marron Park Way. The Harris County unemployment rate was 5.2 percent in July 2026, higher than a year earlier. Third-party listings on ConstructConnect describe the project as site work for a water and sewer project in Houston, Texas, aligning with the TDLR filing scope.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77003 (Houston)
One email per change. Unsubscribe in one click. Privacy.
COH WBS No. S-000035-0270-3 is a Renovation/Alteration project located at Second Ward Area, Houston, TX 77003 in Houston, Texas. The project has an estimated value of $13.6M covering 47,195 sq ft. City of Houston is the property owner and Woolpert, Inc. is the design firm of record. The project was registered with TDLR on August 18, 2025.
Frequently Asked Questions
When is the COH water line replacement scheduled to finish?
Construction is scheduled to finish in December 2026, with work starting in May 2026. TDLR completed plan review in August 2025.
Who is the owner and design firm for this project?
The owner is the City of Houston, and the design firm of record is Woolpert, Inc.
What is the estimated cost and size of the project?
The estimated cost is $13,561,528 for a 47,195 sq ft renovation/alteration project.
Where is the project located?
The project is located in the Second Ward Area, Houston, TX 77003, in Harris County.
Is the project currently open to the public?
The project is in the construction phase, scheduled to start in May 2026. It is not an operating business but infrastructure work.
What is COH WBS No. S-000035-0270-3?
COH WBS No. S-000035-0270-3 is a renovation/alteration project at Second Ward Area in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: COH water line replacement.
Is COH WBS No. S-000035-0270-3 open in Houston?
COH WBS No. S-000035-0270-3 is still under construction in Houston, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is COH WBS No. S-000035-0270-3 located?
COH WBS No. S-000035-0270-3 is located at Second Ward Area, Houston, TX, 77003, in Harris County.
Who is the owner or developer of COH WBS No. S-000035-0270-3?
City of Houston is the property owner/developer of record for COH WBS No. S-000035-0270-3, per its TDLR project registration.
Who is the architect or design firm for COH WBS No. S-000035-0270-3?
Woolpert, Inc. is the design firm of record for COH WBS No. S-000035-0270-3, according to its TDLR filing.
How much does COH WBS No. S-000035-0270-3 cost and how big is it?
COH WBS No. S-000035-0270-3 has an estimated construction value of $13.6M and approximately 47,195 square feet (about $287/sqft), based on its TDLR filing.
Scope of Work
COH water line replacement.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Second Ward Area, Houston, TX, 77003
Related Projects
Same Owner
$2.30B totalSame Design Firm
$115.5M totalWatch all construction in 77003 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.