Ball High South Auditorium Renovation in Galveston, TX
4115 Avenue O, Galveston, TX, 77055
Ball High South Auditorium Renovation is a renovation/alteration project at 4115 Avenue O, Galveston, in Galveston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $27.5M across about 145,000 sq ft.
- Estimated project value
- $27.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 145,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $190/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 6mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
166 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
545 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Ball High South Auditorium Renovation
Galveston Independent School District is undertaking a major renovation of Ball High School, the oldest public high school in Texas, located at 4115 Avenue O in Galveston. The project, filed as Ball High South Auditorium Renovation, involves a complete overhaul of the existing auditorium and locker rooms, with an estimated cost of $27,500,000. This substantial investment covers 145,000 square feet of work, positioning the project well above the median estimated cost of $250,000 for similar renovation filings in Galveston County. The district aims to modernize key student facilities while preserving the historic character of the campus, which has served Galveston students for over a century.
Scope of Work and Design
The construction scope includes the renovation of existing auditorium and locker rooms, along with the conversion of specific spaces to additional locker rooms. New additions will include a scene shop and a lobby, enhancing the school's performance and event capabilities. A critical accessibility improvement involves adding an elevator, ensuring the facility meets modern standards for all students and staff. Additionally, the plan includes the infill of an existing pool, which will free up valuable land for other uses. Studio Red Architects serves as the design firm of record, bringing expertise from previous large-scale projects such as the Fallbrook Church in Cypress and Veranda Commons in Richmond.
The project is registered with TDLR, with Meghan Broussard Simecek listed as the registered accessibility specialist. This registration ensures that the renovation adheres to Texas accessibility standards, a crucial aspect for a public school serving a diverse student body. The use of public funds for this project underscores the district's commitment to providing safe, accessible, and modern facilities for its students. The construction start date is set for February 2026, with completion targeted for August 2027, allowing for a comprehensive build window of 545 days. This timeline is longer than the county median of 120 days for similar projects, reflecting the complexity and scale of the work involved.
Ball High School is situated in a vibrant area of Galveston, near several key local institutions including Galveston College and David Glenn Hunt Memorial Library. The surrounding community, with a median household income of $73,297 according to Census estimates for ZIP 77055, places a high value on educational facilities. The renovation will not only benefit the students of Ball High School but also enhance the overall infrastructure of the district, which includes other registered projects such as the Weis Middle School Parking Lot and Kermit Courville Stadium. This project is part of a broader effort by the Galveston Independent School District to upgrade its facilities, with six other TDLR-registered projects totaling over $50 million in the district.
The renovation of Ball High School represents a significant step forward for one of Texas' most historic schools. By modernizing the auditorium, locker rooms, and adding new amenities like a scene shop and elevator, the district is ensuring that the school remains a relevant and accessible hub for education and community events. The project's registration with TDLR and the involvement of experienced design firms like Studio Red Architects provide confidence that the work will be completed to high standards. As construction begins in February 2026, the community can look forward to a refreshed and modernized Ball High School, ready to serve students for generations to come.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77055 (Galveston)
One email per change. Unsubscribe in one click. Privacy.
Ball High South Auditorium Renovation is a Renovation/Alteration project located at 4115 Avenue O, Galveston, TX 77055 in Galveston, Texas. The project has an estimated value of $27.5M covering 145,000 sq ft. Galveston Independent School District is the property owner and Studio Red Architects is the design firm of record. The project was registered with TDLR on August 20, 2025.
Frequently Asked Questions
What is the estimated cost of the Ball High School renovation?
The estimated cost for the Ball High South Auditorium Renovation is $27,500,000. This figure covers the renovation of the auditorium, locker rooms, and new additions like a scene shop and lobby.
Who is the design firm for the project?
Studio Red Architects is the design firm of record for the Ball High School renovation. They have experience with other large-scale projects in Texas, including the Fallbrook Church in Cypress.
When is the project targeted for completion?
The project is targeted for August 2027. Construction is scheduled to start in February 2026, with a total build window of 545 days.
Is the school open during construction?
The TDLR record only confirms the construction status, with completion targeted for August 2027. It does not specify operational hours or whether the school remains open during the renovation.
What new features are being added to the auditorium?
The renovation includes a new scene shop and lobby, along with the addition of an elevator for accessibility. The existing pool will also be infilled to make space for other uses.
What is Ball High South Auditorium Renovation?
Ball High South Auditorium Renovation is a renovation/alteration project at 4115 Avenue O in Galveston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing auditorium & locker rooms, conversion of space to locker rooms, addition of scene shop and lobby, adding an elevator, infill of existing pool.
Is Ball High South Auditorium Renovation open in Galveston?
Ball High South Auditorium Renovation is still under construction in Galveston, TX, with an estimated completion of Aug 2027 according to its TDLR registration.
Where is Ball High South Auditorium Renovation located?
Ball High South Auditorium Renovation is located at 4115 Avenue O, Galveston, TX, 77055, in Galveston County.
Who is the owner or developer of Ball High South Auditorium Renovation?
Galveston Independent School District is the property owner/developer of record for Ball High South Auditorium Renovation, per its TDLR project registration.
Who is the architect or design firm for Ball High South Auditorium Renovation?
Studio Red Architects is the design firm of record for Ball High South Auditorium Renovation, according to its TDLR filing.
How much does Ball High South Auditorium Renovation cost and how big is it?
Ball High South Auditorium Renovation has an estimated construction value of $27.5M and approximately 145,000 square feet (about $190/sqft), based on its TDLR filing.
Scope of Work
Renovation of existing auditorium & locker rooms, conversion of space to locker rooms, addition of scene shop and lobby, adding an elevator, infill of existing pool.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
4115 Avenue O, Galveston, TX, 77055
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$404.5M totalWatch all construction in 77055 (Galveston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Galveston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.