CHENIERE GAS CONTROL in Houston, TX

1301 Fannin, Suite 100, Houston, TX, 77002

Construction complete · Aug 2026Inspection Complete

CHENIERE GAS CONTROL is a renovation/alteration project at 1301 Fannin, Suite 100, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $870K across about 4,543 sq ft.

Estimated project value
$870K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,543 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$192/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 25, 2025352 days across supplied datesAug 12, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    37 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    177 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    138 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About CHENIERE GAS CONTROL

The Cheniere GAS Control renovation at 1301 Fannin, Suite 100, in Houston’s Central Business District is complete. The project passed its final TDLR accessibility inspection in August 2026, confirming that all construction work is finished. This renovation of a 4,543 sq ft office space was valued at $870,072.

The scope of work involved the interior buildout of existing, demolished space to provide a renovated office for a tenant. The project was registered with the Texas Department of Licensing and Regulation (TDLR) in August 2025, with plan review completed in the same month. Construction began in October 2025, following a scheduled build window of 177 days.

Project Scale and Cost

At $870,072, this project’s estimated cost sits above the Harris County median of $250,000 for similar renovation filings. The cost per square foot of $192 is also above the county median of $80. The scheduled build window was longer than the county median of 92 days, reflecting the complexity of the interior buildout.

The owner of record is 1301 Fannin Owner LP, which has six other TDLR-registered projects totaling $2,878,623. The design firm of record is PDR corp, which has completed six other projects totaling $94,241,133. The registered accessibility specialist is Kathy S Rodriguez. The project is privately funded on private land for private use.

City of Houston permit records show two building permits issued at this street address between July 2026 and July 2026. These permits cover office remodeling and corridor/HVAC relocation. The TDLR status for this project is Inspection Complete, marking the end of the regulatory process for this specific renovation.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77002 (Houston)

One email per change. Unsubscribe in one click. Privacy.

CHENIERE GAS CONTROL is a Renovation/Alteration project located at 1301 Fannin, Suite 100, Houston, TX 77002 in Houston, Texas. The project has an estimated value of $870K covering 4,543 sq ft. 1301 Fannin Owner LP is the property owner and PDR corp is the design firm of record. The project was registered with TDLR on August 25, 2025.

Frequently Asked Questions

Is the Cheniere GAS Control renovation finished?

Yes, the project passed its final TDLR accessibility inspection in August 2026. The TDLR status is Inspection Complete, confirming construction is done.

Who owns the building at 1301 Fannin?

The owner of record is 1301 Fannin Owner LP. This entity has six other TDLR-registered projects in Houston totaling $2,878,623.

How much did the renovation cost?

The estimated cost was $870,072. This is above the Harris County median of $250,000 for similar renovation filings.

Who designed the office space?

The design firm of record is PDR corp. They have completed six other TDLR-registered projects totaling $94,241,133.

What was the scope of work?

The scope involved the interior buildout of existing, demolished space to provide a renovated office for a tenant.

What is CHENIERE GAS CONTROL?

CHENIERE GAS CONTROL is a renovation/alteration project at 1301 Fannin, Suite 100 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR BUILDOUT OF EXISTING, DEMOLISHED SPACE TO PROVIDE RENOVATED OFFICE FOR TENANT.

Is CHENIERE GAS CONTROL open in Houston?

Construction on CHENIERE GAS CONTROL is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is CHENIERE GAS CONTROL located?

CHENIERE GAS CONTROL is located at 1301 Fannin, Suite 100, Houston, TX, 77002, in Harris County.

Who is the owner or developer of CHENIERE GAS CONTROL?

1301 Fannin Owner LP is the property owner/developer of record for CHENIERE GAS CONTROL, per its TDLR project registration.

Who is the architect or design firm for CHENIERE GAS CONTROL?

PDR corp is the design firm of record for CHENIERE GAS CONTROL, according to its TDLR filing.

How much does CHENIERE GAS CONTROL cost and how big is it?

CHENIERE GAS CONTROL has an estimated construction value of $870K and approximately 4,543 square feet (about $192/sqft), based on its TDLR filing.

Scope of Work

INTERIOR BUILDOUT OF EXISTING, DEMOLISHED SPACE TO PROVIDE RENOVATED OFFICE FOR TENANT.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1301 Fannin, Suite 100, Houston, TX, 77002

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

1301 FANNIN ST 900, Houston, TX 77002

OFFICE REMODEL, (2/2) 1-25-1-B-A 2021 IBC SPK

IssuedBuilding PmtJul 2026
HOU-26056265-BUILDINGPMT
1301 FANNIN ST FL 9, Houston, TX 77002

CORRIDOR/ HVAC RELOCATATION (M/2) 1-25-1-B-A 2021 IBC SPK

IssuedBuilding PmtJul 2026
HOU-26047882-BUILDINGPMT

Watch all construction in 77002 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.