Project intelligenceTDLR TABS2025026879New Construction
Funding type

This project is privately funded, on private land for private use.

0361 Tom Thumb Fuel Center

NWC--FM 455 & Chapman Rd Lot 9, Sanger, TX, 76266

Target date passed (Sep 2026)Review Complete

0361 Tom Thumb Fuel Center is a new construction project at NWC--FM 455 & Chapman Rd Lot 9, Sanger, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $78K across about 588 sq ft.

Estimated project value
$78K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
588 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$132/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 27, 2025380 days across supplied datesSep 11, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    138 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    242 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76266 (Sanger)

One email per change. Unsubscribe in one click. Privacy.

0361 Tom Thumb Fuel Center is a New Construction project located at NWC--FM 455 & Chapman Rd Lot 9, Sanger, TX 76266 in Sanger, Texas. The project has an estimated value of $78K covering 588 sq ft. Steve Gregory is the property owner and CSHQA is the design firm of record. The project was registered with TDLR on August 27, 2025.

Frequently Asked Questions

What is 0361 Tom Thumb Fuel Center?

0361 Tom Thumb Fuel Center is a new construction project at NWC--FM 455 & Chapman Rd Lot 9 in Sanger, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 588 sqft fuel and convenience center.

Is 0361 Tom Thumb Fuel Center open in Sanger?

0361 Tom Thumb Fuel Center was scheduled to finish construction in Sep 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is 0361 Tom Thumb Fuel Center located?

0361 Tom Thumb Fuel Center is located at NWC--FM 455 & Chapman Rd Lot 9, Sanger, TX, 76266, in Denton County.

Who is the owner or developer of 0361 Tom Thumb Fuel Center?

Steve Gregory is the property owner/developer of record for 0361 Tom Thumb Fuel Center, per its TDLR project registration.

Who is the architect or design firm for 0361 Tom Thumb Fuel Center?

CSHQA is the design firm of record for 0361 Tom Thumb Fuel Center, according to its TDLR filing.

How much does 0361 Tom Thumb Fuel Center cost and how big is it?

0361 Tom Thumb Fuel Center has an estimated construction value of $78K and approximately 588 square feet (about $132/sqft), based on its TDLR filing.

Scope of Work

New 588 sqft fuel and convenience center.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

NWC--FM 455 & Chapman Rd Lot 9, Sanger, TX, 76266

Location by street address

Watch all construction in 76266 (Sanger)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Denton

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists