Project intelligenceTDLR TABS2025026888New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Glenna Street, Edmund Boulevard, West 19th Street Roadway Improvements

Glenna Street, Edmund Boulevard, West 29th Street, San Angelo, TX, 76903

Construction complete · May 2026Inspection Complete

Glenna Street, Edmund Boulevard, West 19th Street Roadway Improvements is a new construction project at Glenna Street, Edmund Boulevard, West 29th Street, San Angelo, in Tom Green County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $272K across about 3,402 sq ft.

Estimated project value
$272K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,402 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$80/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 15, 2025534 days across supplied datesDec 1, 2026

5 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    74 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    267 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    193 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Glenna Street, Edmund Boulevard, West 19th Street Roadway Improvements

The City of San Angelo completed roadway accessibility improvements along Glenna Street, Edmund Boulevard, and West 29th Street in Tom Green County. The project passed its final TDLR accessibility inspection in May 2026, confirming that construction is complete. This new construction effort focused on enhancing pedestrian safety and compliance at signalized intersections within the San Angelo ZIP code 76903 area.

Project Scope and Design

Freese and Nichols, Inc. served as the design firm of record for this initiative, which was registered with TDLR in August 2025. The scope of work included the installation of 3,402 square feet of new concrete sidewalk, the construction of 28 curb ramps, and the placement of 11 pedestrian poles at signalized intersections. New crosswalk striping was also applied to improve visibility and navigation for pedestrians. Stephen D Macphie acted as the registered accessibility specialist overseeing the project's adherence to state standards.

The estimated cost for the project was $272,000, resulting in a cost of $80 per square foot. This figure is below the county median of $134 per square foot for similar new construction filings in Tom Green County. The scheduled build window was 534 days, which is longer than the county median of 216 days for comparable projects. The project utilized public funds and involved public land, reflecting the City of San Angelo's ongoing investment in local infrastructure.

Regional Context and Status

This project is one of several registered by the City of San Angelo, which has six other TDLR-registered projects totaling $48,244,277. Other notable projects in the portfolio include the San Angelo Coliseum and N. Concho River improvements. Freese and Nichols, Inc. has also worked on six other TDLR-registered projects across Texas, totaling $39,188,190, including work in Austin and Corpus Christi. The completion of this project adds to the existing accessibility infrastructure in the area, which includes other registered projects such as the Village Shopping Center and Sunset Mall renovations.

According to U.S. Census ACS 2023 five-year estimates, the ZIP code 76903 area has a population of about 31,181 people. The median household income is $49,045, and the median owner-occupied home value is $115,900. The housing stock is mostly owner-occupied, with 14,169 housing units in the area. The project's completion ensures that these roadway improvements meet the required accessibility standards for the community they serve.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76903 (San Angelo)

One email per change. Unsubscribe in one click. Privacy.

Glenna Street, Edmund Boulevard, West 19th Street Roadway Improvements is a New Construction project located at Glenna Street, Edmund Boulevard, West 29th Street, San Angelo, TX 76903 in San Angelo, Texas. The project has an estimated value of $272K covering 3,402 sq ft. City of San Angelo is the property owner and Freese and Nichols, Inc. is the design firm of record. The project was registered with TDLR on August 28, 2025.

Frequently Asked Questions

Is the sidewalk project finished?

Yes, construction is complete. The project passed its final TDLR accessibility inspection in May 2026, and the TDLR status is listed as Inspection Complete.

Who designed the roadway improvements?

Freese and Nichols, Inc. is the design firm of record for the Glenna Street, Edmund Boulevard, and West 29th Street improvements.

What specific accessibility features were added?

The project added 3,402 square feet of concrete sidewalk, 28 curb ramps, 11 pedestrian poles, and new crosswalk striping.

How much did the project cost?

The estimated cost was $272,000, which works out to $80 per square foot for the 3,402 square feet of work.

Is this a new construction project?

Yes, the type of work is classified as New Construction, involving new sidewalks, ramps, and poles rather than renovation of existing structures.

What is Glenna Street, Edmund Boulevard, West 19th Street Roadway Improvements?

Glenna Street, Edmund Boulevard, West 19th Street Roadway Improvements is a new construction project at Glenna Street, Edmund Boulevard, West 29th Street in San Angelo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 3,402 sf concrete sidewalk, 28 curb ramps, 11 pedestrian poles as signalized intersections, and new crosswalk striping

Is Glenna Street, Edmund Boulevard, West 19th Street Roadway Improvements open in San Angelo?

Construction on Glenna Street, Edmund Boulevard, West 19th Street Roadway Improvements is complete — TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.

Where is Glenna Street, Edmund Boulevard, West 19th Street Roadway Improvements located?

Glenna Street, Edmund Boulevard, West 19th Street Roadway Improvements is located at Glenna Street, Edmund Boulevard, West 29th Street, San Angelo, TX, 76903, in Tom Green County.

Who is the owner or developer of Glenna Street, Edmund Boulevard, West 19th Street Roadway Improvements?

City of San Angelo is the property owner/developer of record for Glenna Street, Edmund Boulevard, West 19th Street Roadway Improvements, per its TDLR project registration.

Who is the architect or design firm for Glenna Street, Edmund Boulevard, West 19th Street Roadway Improvements?

Freese and Nichols, Inc. is the design firm of record for Glenna Street, Edmund Boulevard, West 19th Street Roadway Improvements, according to its TDLR filing.

How much does Glenna Street, Edmund Boulevard, West 19th Street Roadway Improvements cost and how big is it?

Glenna Street, Edmund Boulevard, West 19th Street Roadway Improvements has an estimated construction value of $272K and approximately 3,402 square feet (about $80/sqft), based on its TDLR filing.

Scope of Work

3,402 sf concrete sidewalk, 28 curb ramps, 11 pedestrian poles as signalized intersections, and new crosswalk striping

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Glenna Street, Edmund Boulevard, West 29th Street, San Angelo, TX, 76903

Location by street address

Watch all construction in 76903 (San Angelo)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Angelo?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.