Funding type
This project is privately funded, on private land for private use.
Maverick Bank in Levelland, TX
201 Houston Street, Levelland, TX, 79336
Maverick Bank is a new construction project at 201 Houston Street, Levelland, in Hockley County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $1.2M across about 2,138 sq ft.
- Estimated project value
- $1.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,138 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $561/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 11 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
34 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
95 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
240 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
2 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Maverick Bank
Maverick Bank completed ground-up new construction at 201 Houston Street in Levelland, Texas. The 2,138 sq ft building, registered with TDLR in August 2025, passed its final TDLR accessibility inspection in September 2026, confirming the project is finished. Construction began in October 2025 and concluded within the scheduled timeframe, marking the end of a 335-day build window.
The project, filed as Maverick Bank Levelland, was privately funded on private land for private use. With an estimated cost of $1,200,000, the investment equates to $561 per square foot. This figure is above the county median of $266 per square foot for similar new construction filings in Hockley County, reflecting the specific scope and quality of the build.
Project Scope and Location
Located in Hockley County, the bank facility sits in a commercial area of Levelland, a community with a population of about 15,265 according to recent Census estimates for the ZIP code. The site is situated near existing local businesses, including a Sonic Drive-In, a CVS, and United Supermarkets Pharmacy. The median household income in this area is estimated at $52,724, providing context for the local economic environment where the new bank branch operates.
Jeffery L Kelley served as the registered accessibility specialist for the project. Plan review was completed in January 2026, allowing construction to proceed with the necessary approvals. The final inspection passed in September 2026, resolving the project’s regulatory status. This completion aligns with the broader trend of new commercial developments in the region, including nearby projects such as a Whataburger and a 7Brew Coffee Shop.
Market Context
Maverick Bank also maintains another TDLR-registered project in Seminole, Texas, with a similar estimated cost of $1,200,000. That project has also completed its inspection. The Levelland facility represents a significant addition to the local financial infrastructure, with a build cost above the median for Hockley County new constructions. The scheduled build window of 335 days was longer than the county median of 214 days, indicating a thorough construction process for this specific facility.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79336 (Levelland)
One email per change. Unsubscribe in one click. Privacy.
Maverick Bank is a New Construction project located at 201 Houston Street, Levelland, TX 79336 in Levelland, Texas. The project has an estimated value of $1.2M covering 2,138 sq ft. Maverick Bank is the property owner. The project was registered with TDLR on August 28, 2025.
Frequently Asked Questions
Is the Maverick Bank building in Levelland finished?
Yes, the construction is complete. The building passed its final TDLR accessibility inspection in September 2026, which confirms that the ground-up new construction project has concluded successfully according to the registered record.
How much did the new bank building cost to build?
The estimated cost for the Maverick Bank Levelland project was $1,200,000. This translates to $561 per square foot for the 2,138 sq ft facility, a figure that is above the median cost per square foot for similar projects in Hockley County.
Who was the accessibility specialist for this project?
Jeffery L Kelley was the registered accessibility specialist listed on the TDLR filing. This individual ensured the building met the required standards, leading to the successful completion of the final inspection in September 2026.
Where exactly is the new bank located?
The facility is located at 201 Houston Street in Levelland, Texas. It is situated in Hockley County, near other local businesses such as a Sonic Drive-In and a CVS pharmacy, within the 79336 ZIP code area.
How long did the construction take?
Construction began in October 2025 and the final inspection was passed in September 2026. This represents a build window of 335 days, which is longer than the median scheduled build window of 214 days for similar projects in the county.
What is Maverick Bank?
Maverick Bank is a new construction project at 201 Houston Street in Levelland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Ground up New Construction
Is Maverick Bank open in Levelland?
Construction on Maverick Bank is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.
Where is Maverick Bank located?
Maverick Bank is located at 201 Houston Street, Levelland, TX, 79336, in Hockley County.
Who is the owner or developer of Maverick Bank?
Maverick Bank is the property owner/developer of record for Maverick Bank, per its TDLR project registration.
How much does Maverick Bank cost and how big is it?
Maverick Bank has an estimated construction value of $1.2M and approximately 2,138 square feet (about $561/sqft), based on its TDLR filing.
Scope of Work
Ground up New Construction
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
201 Houston Street, Levelland, TX, 79336
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$2.4M totalWatch all construction in 79336 (Levelland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Levelland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.