Project intelligenceTDLR TABS2025026980Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

City of Raymondville ADA Renovation of Downtown Sidewalks & Ramps

Main Ave to Kimball Ave, Between 4th St and 6th St, Raymondville, TX, 78580

Construction complete · Aug 2026Inspection Complete

City of Raymondville ADA Renovation of Downtown Sidewalks & Ramps is a renovation/alteration project at Main Ave to Kimball Ave, Between 4th St and 6th St, Raymondville, in Willacy County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $280K across about 10,000 sq ft.

Estimated project value
$280K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
10,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$28/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 28, 2025363 days across supplied datesAug 26, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    4 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    59 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    300 days after the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78580 (Raymondville)

One email per change. Unsubscribe in one click. Privacy.

City of Raymondville ADA Renovation of Downtown Sidewalks & Ramps is a Renovation/Alteration project located at Main Ave to Kimball Ave, Between 4th St and 6th St, Raymondville, TX 78580 in Raymondville, Texas. The project has an estimated value of $280K covering 10,000 sq ft. City of Raymondville is the property owner and Ambiotec Civil Engineering is the design firm of record. The project was registered with TDLR on August 28, 2025.

Frequently Asked Questions

What is City of Raymondville ADA Renovation of Downtown Sidewalks & Ramps?

City of Raymondville ADA Renovation of Downtown Sidewalks & Ramps is a renovation/alteration project at Main Ave to Kimball Ave, Between 4th St and 6th St in Raymondville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovations to existing sidewalks and additions of ADA ramps.

Is City of Raymondville ADA Renovation of Downtown Sidewalks & Ramps open in Raymondville?

Construction on City of Raymondville ADA Renovation of Downtown Sidewalks & Ramps is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is City of Raymondville ADA Renovation of Downtown Sidewalks & Ramps located?

City of Raymondville ADA Renovation of Downtown Sidewalks & Ramps is located at Main Ave to Kimball Ave, Between 4th St and 6th St, Raymondville, TX, 78580, in Willacy County.

Who is the owner or developer of City of Raymondville ADA Renovation of Downtown Sidewalks & Ramps?

City of Raymondville is the property owner/developer of record for City of Raymondville ADA Renovation of Downtown Sidewalks & Ramps, per its TDLR project registration.

Who is the architect or design firm for City of Raymondville ADA Renovation of Downtown Sidewalks & Ramps?

Ambiotec Civil Engineering is the design firm of record for City of Raymondville ADA Renovation of Downtown Sidewalks & Ramps, according to its TDLR filing.

How much does City of Raymondville ADA Renovation of Downtown Sidewalks & Ramps cost and how big is it?

City of Raymondville ADA Renovation of Downtown Sidewalks & Ramps has an estimated construction value of $280K and approximately 10,000 square feet (about $28/sqft), based on its TDLR filing.

Scope of Work

Renovations to existing sidewalks and additions of ADA ramps.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Watch all construction in 78580 (Raymondville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Willacy

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists