Level 32 Restrooms at Frost Tower
Level 32 Restrooms at Frost Tower is a renovation/alteration project at 401 Congress Avenue, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $350K across about 546 sq ft.
๐Project Metrics
TDLR #TABS2025027095Review Complete
Design review complete, construction may proceed
Level 32 Restrooms at Frost Tower is a Renovation/Alteration project located at 401 Congress Avenue, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $350K covering 546 sq ft. CSHV-401 Congress, LLC is the property owner. The project was registered with TDLR on August 30, 2025.
โFrequently Asked Questions
What is Level 32 Restrooms at Frost Tower?
Level 32 Restrooms at Frost Tower is a renovation/alteration project at 401 Congress Avenue in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of existing restrooms.
Is Level 32 Restrooms at Frost Tower open in Austin?
Level 32 Restrooms at Frost Tower is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is Level 32 Restrooms at Frost Tower located?
Level 32 Restrooms at Frost Tower is located at 401 Congress Avenue, Austin, TX, 78701, in Travis County.
Who is the owner or developer of Level 32 Restrooms at Frost Tower?
CSHV-401 Congress, LLC is the property owner/developer of record for Level 32 Restrooms at Frost Tower, per its TDLR project registration.
How much does Level 32 Restrooms at Frost Tower cost and how big is it?
Level 32 Restrooms at Frost Tower has an estimated construction value of $350K and approximately 546 square feet (about $641/sqft), based on its TDLR filing.
๐Scope of Work
Interior renovation of existing restrooms.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 30, 2025
Review Complete
Jan 4, 2026
Inspection Complete
Closed
127d
Review duration
๐Related Projects
๐คSame Owner
$17.9M total๐Related City Permits
Building permits found at or near this location
Unit A New construction of Duplex 4 bed 4.5 baths with attached 1 bedroom 2nd unit with single bath and kitchenette
New 2-story Duplex Unit 6101 2bdr 2.5 Bath New 2-story Duplex Unit 6102 2 Bdr 2.5 Bath
Unit B 1 Story duplex 1/1 SEE EP 2026 058862
Unit A New construction of Duplex 4 bed 4.5 baths with attached 1 bedroom 2nd unit with single bath and kitchenette RELATED TO EP 2026 058863
Replacement of an existing water heater Removing old existing tankless water heater and installing new tankless water heater.