Project intelligenceTDLR TABS2026000161Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Restaurant Inline Tenant Finish Out in Mesquite, TX

5550 S. Buckner BLVD. STE 300, Mesquite, TX, 75149

Target date passed (Apr 2026)Review Complete

Restaurant Inline Tenant Finish Out is a renovation/alteration project at 5550 S. Buckner BLVD. STE 300, Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Apr 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.2M across about 11,000 sq ft.

Estimated project value
$1.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
11,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$109/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 3, 2025210 days across supplied datesApr 1, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    89 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    19 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    102 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Restaurant Inline Tenant Finish Out

Renovation work to convert 11,000 sq ft of existing mercantile space into a Peter Piper Pizza restaurant is underway at 5550 S. Buckner Blvd. Ste 300 in Mesquite, TX 75149. The project, filed as a Restaurant Inline Tenant Finish Out, involves the conversion of the space for CEC Entertainment LLC, with Justin Lee listed as the tenant. The estimated cost for this alteration is $1,200,000, resulting in a cost of $109 per square foot.

The owner of record is NEC Buckner & Samuel, L.P., and Prizm Architects serves as the design firm. Michael Lynn Kelley is the registered accessibility specialist for this project. TDLR completed plan review in December 2025, and construction was scheduled to finish in April 2026. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.

Project Scale and Context

This renovation is significantly larger and more expensive than the typical project in Dallas County. Among 32,551 registered renovation and alteration filings in the county, the median estimated cost is $249,644, and the median size is 4,224 sq ft. This project’s $1,200,000 cost is in the top quarter for its type, and its $109 per square foot is above the county median of $73. The scheduled build window of 121 days is also longer than the county median of 92 days.

Prizm Architects has registered six other projects totaling $4,850,000, including locations in Houston, Longview, Lancaster, Stephenville, and Fort Worth. The site is located in a commercial area with nearby businesses such as Sam’s Club, Dollar Tree, and GameStop. According to U.S. Census estimates for ZIP 75149, the population is about 58,849, with a median household income of $70,629.

Third-party sources have noted the location. A post by the City of Mesquite mayor described welcoming the new location on May 27. Peter Piper Pizza’s website announced a reimagined family entertainment experience for the Mesquite location on May 21, 2026. These external reports suggest activity at the site, but the official TDLR record remains the primary source for construction status and regulatory compliance.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75149 (Mesquite)

One email per change. Unsubscribe in one click. Privacy.

Restaurant Inline Tenant Finish Out is a Renovation/Alteration project located at 5550 S. Buckner BLVD. STE 300, Mesquite, TX 75149 in Mesquite, Texas. The project has an estimated value of $1.2M covering 11,000 sq ft. NEC Buckner & Samuel, L.P. is the property owner and Prizm Architects is the design firm of record. The project was registered with TDLR on September 3, 2025.

Frequently Asked Questions

Is the Peter Piper Pizza in Mesquite open for business?

A Facebook post by the City of Mesquite mayor reported welcoming the location on May 27. However, TDLR has not yet recorded a final inspection, so the official construction status is not confirmed in the public record.

Who is the developer for this Peter Piper Pizza project?

The owner of record is NEC Buckner & Samuel, L.P. The tenant is CEC Entertainment LLC, with Justin Lee listed as the business contact.

How much did this renovation cost?

The estimated cost for the 11,000 sq ft renovation is $1,200,000. This places the project in the top quarter of costs for similar renovations in Dallas County.

Who designed the Peter Piper Pizza space?

Prizm Architects is the design firm of record. They have registered six other projects totaling $4,850,000 across various Texas cities.

When was the plan review completed?

TDLR completed plan review in December 2025. Construction was scheduled to finish in April 2026, but no final inspection has been recorded.

What is Restaurant Inline Tenant Finish Out?

Restaurant Inline Tenant Finish Out is a renovation/alteration project at 5550 S. Buckner BLVD. STE 300 in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: THE PROJECT SCOPE OUTLINED IN THIS SET OF PLANS INCLUDES THE CONVERSION OF AN EXISTING 11,000 SF. IN-LINE MERCANTILE SPACE TO A TENANT FINISH OUT FOR A PETER PIPER PIZZA RESTAURANT BUILDING.

Is Restaurant Inline Tenant Finish Out open in Mesquite?

Restaurant Inline Tenant Finish Out was scheduled to finish construction in Apr 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Restaurant Inline Tenant Finish Out located?

Restaurant Inline Tenant Finish Out is located at 5550 S. Buckner BLVD. STE 300, Mesquite, TX, 75149, in Dallas County.

Who is the owner or developer of Restaurant Inline Tenant Finish Out?

NEC Buckner & Samuel, L.P. is the property owner/developer of record for Restaurant Inline Tenant Finish Out, per its TDLR project registration.

Who is the architect or design firm for Restaurant Inline Tenant Finish Out?

Prizm Architects is the design firm of record for Restaurant Inline Tenant Finish Out, according to its TDLR filing.

How much does Restaurant Inline Tenant Finish Out cost and how big is it?

Restaurant Inline Tenant Finish Out has an estimated construction value of $1.2M and approximately 11,000 square feet (about $109/sqft), based on its TDLR filing.

Scope of Work

THE PROJECT SCOPE OUTLINED IN THIS SET OF PLANS INCLUDES THE CONVERSION OF AN EXISTING 11,000 SF. IN-LINE MERCANTILE SPACE TO A TENANT FINISH OUT FOR A PETER PIPER PIZZA RESTAURANT BUILDING.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5550 S. Buckner BLVD. STE 300, Mesquite, TX, 75149

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75149 (Mesquite)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mesquite?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.