Kroger DAL-557 New Fuel Center is a new construction project at 6850 N. Shiloh Rd., Garland, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.2M across about 209 sq ft.
Design review complete, construction may proceed
Kroger DAL-557 New Fuel Center is a New Construction project located at 6850 N. Shiloh Rd., Garland, TX 75044 in Garland, Texas. The project has an estimated value of $1.2M covering 209 sq ft. US Regency Shiloh Springs LLC is the property owner and CEI Engineering Associates is the design firm of record. The project was registered with TDLR on September 4, 2025.
Kroger DAL-557 New Fuel Center is a new construction project at 6850 N. Shiloh Rd. in Garland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Building a new 5-in-line multi-product dispenser fuel center with 209 SF kiosk. Installing UST on-site for fuel sales
Kroger DAL-557 New Fuel Center is currently under construction in Garland, TX. Its current TDLR status is "Review Complete".
Kroger DAL-557 New Fuel Center is located at 6850 N. Shiloh Rd., Garland, TX, 75044, in Dallas County.
US Regency Shiloh Springs LLC is the property owner/developer of record for Kroger DAL-557 New Fuel Center, per its TDLR project registration.
CEI Engineering Associates is the design firm of record for Kroger DAL-557 New Fuel Center, according to its TDLR filing.
Kroger DAL-557 New Fuel Center has an estimated construction value of $1.2M and approximately 209 square feet (about $5.74K/sqft), based on its TDLR filing.
Building a new 5-in-line multi-product dispenser fuel center with 209 SF kiosk. Installing UST on-site for fuel sales
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 4, 2025
Review Complete
Jun 20, 2026
Inspection Complete
Closed
289d
Review duration
Need a contractor for this project?
Browse verified general contractors active in Dallas County
Find General Contractors in Dallas