Hackberry Park Imp. PH 3 in Mont Belvieu, TX
Langston Blvd., Mont Belvieu, TX, 77580
Hackberry Park Imp. PH 3 is a new construction project at Langston Blvd., Mont Belvieu, in Chambers County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $1.8M across about 85,000 sq ft.
- Estimated project value
- $1.8M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 85,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $21/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 8 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
3 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
235 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
151 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Hackberry Park Imp. PH 3
The Hackberry Park Improvement Phase 3 project in Mont Belvieu is complete. This new construction effort focused on concrete pathways and pedestrian bridges along Langston Blvd. in Chambers County. The City of Mont Belvieu served as the owner of record for this $1,800,000 development, which covered an area of 85,000 square feet.
Construction was registered with the Texas Department of Licensing and Regulation (TDLR) in September 2025. The filing indicated a scheduled completion date of May 2026, though the project timeline extended beyond that initial estimate. The work was designed by Mcla, a firm with a portfolio of similar public infrastructure projects in the region.
Project Scope and Financials
The estimated cost of $1,800,000 places this project close to the median estimated cost for new construction filings in Chambers County, which stands at $1,600,000. The project’s cost per square foot is $21, a figure that falls below the county median of $105 per square foot for comparable new construction. This efficiency reflects the specific nature of the work, which involved linear infrastructure rather than enclosed building space.
The scheduled build window for this phase was 235 days, a duration close to the county median of 304 days for similar projects. The City of Mont Belvieu has registered six other projects with TDLR, totaling $23,180,000, indicating a sustained commitment to local infrastructure improvements. These other projects include various road improvements and recreation centers across the city.
Regulatory Status and Location
This designation simplifies certain environmental compliance requirements associated with construction in high-risk areas. Tim Mullins served as the registered accessibility specialist for the project, ensuring the pathways and bridges met required standards.
The project passed its final TDLR accessibility inspection in September 2026, confirming that the construction is complete. This status resolves any questions regarding the operational readiness of the new pathways and bridges. The completion of this phase adds to the growing network of accessible public spaces in Mont Belvieu, near existing businesses such as H-E-B and MercyGate Church.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77580 (Mont Belvieu)
One email per change. Unsubscribe in one click. Privacy.
Hackberry Park Imp. PH 3 is a New Construction project located at Langston Blvd., Mont Belvieu, TX 77580 in Mont Belvieu, Texas. The project has an estimated value of $1.8M covering 85,000 sq ft. City of Mont Belvieu is the property owner and MCLA is the design firm of record. The project was registered with TDLR on September 5, 2025.
Frequently Asked Questions
Is the Hackberry Park Phase 3 construction finished?
Yes, the project passed its final TDLR accessibility inspection in September 2026. The record confirms the construction is complete, and the concrete pathways and pedestrian bridges are finished.
What is the total cost of the project?
The estimated cost for the Hackberry Park Improvement Phase 3 is $1,800,000. This figure covers the new construction of concrete pathways and pedestrian bridges in Mont Belvieu.
Who is the owner of the project?
The City of Mont Belvieu is the owner and developer of record for this project. They are responsible for the development of these public infrastructure improvements.
Who designed the pathways and bridges?
Mcla is the design firm of record for this project. They handled the design work for the concrete pathways and pedestrian bridges in Phase 3.
What is Hackberry Park Imp. PH 3?
Hackberry Park Imp. PH 3 is a new construction project at Langston Blvd. in Mont Belvieu, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Concrete pathways and Pedestrian Bridges
Is Hackberry Park Imp. PH 3 open in Mont Belvieu?
Construction on Hackberry Park Imp. PH 3 is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.
Where is Hackberry Park Imp. PH 3 located?
Hackberry Park Imp. PH 3 is located at Langston Blvd., Mont Belvieu, TX, 77580, in Chambers County.
Who is the owner or developer of Hackberry Park Imp. PH 3?
City of Mont Belvieu is the property owner/developer of record for Hackberry Park Imp. PH 3, per its TDLR project registration.
Who is the architect or design firm for Hackberry Park Imp. PH 3?
MCLA is the design firm of record for Hackberry Park Imp. PH 3, according to its TDLR filing.
How much does Hackberry Park Imp. PH 3 cost and how big is it?
Hackberry Park Imp. PH 3 has an estimated construction value of $1.8M and approximately 85,000 square feet (about $21/sqft), based on its TDLR filing.
Scope of Work
Concrete pathways and Pedestrian Bridges
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Langston Blvd., Mont Belvieu, TX, 77580
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$70.6M totalWatch all construction in 77580 (Mont Belvieu)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Mont Belvieu?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.