K2 High Voltage Lab Expansion
K2 High Voltage Lab Expansion is a renovation/alteration project at 12500 TI Blvd., Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $604K across about 2,100 sq ft.
๐Project Metrics
TDLR #TABS2026000421Project Closed
Project has been completed and closed
K2 High Voltage Lab Expansion is a Renovation/Alteration project located at 12500 TI Blvd., Dallas, TX 75243 in Dallas, Texas. The project has an estimated value of $604K covering 2,100 sq ft. Texas Instruments, Inc. is the property owner. The project was registered with TDLR on September 5, 2025.
โFrequently Asked Questions
What is K2 High Voltage Lab Expansion?
K2 High Voltage Lab Expansion is a renovation/alteration project at 12500 TI Blvd. in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel 2,100 SF lab space, Add sheet rock headers, electrical panel/EPO buttons, modify existing storefront, electrical, CDA, fire protection. Add/relocate tech benches, Remove/rework modular storage rooms.
Is K2 High Voltage Lab Expansion open in Dallas?
Construction on K2 High Voltage Lab Expansion is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
Where is K2 High Voltage Lab Expansion located?
K2 High Voltage Lab Expansion is located at 12500 TI Blvd., Dallas, TX, 75243, in Dallas County.
Who is the owner or developer of K2 High Voltage Lab Expansion?
Texas Instruments, Inc. is the property owner/developer of record for K2 High Voltage Lab Expansion, per its TDLR project registration.
How much does K2 High Voltage Lab Expansion cost and how big is it?
K2 High Voltage Lab Expansion has an estimated construction value of $604K and approximately 2,100 square feet (about $288/sqft), based on its TDLR filing.
๐Scope of Work
Remodel 2,100 SF lab space, Add sheet rock headers, electrical panel/EPO buttons, modify existing storefront, electrical, CDA, fire protection. Add/relocate tech benches, Remove/rework modular storage rooms.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 5, 2025
Review Complete
Sep 5, 2025
Inspection Complete
Feb 21, 2026
Closed
Jun 27, 2026
169d
Construction phase