Project intelligenceTDLR TABS2026000532Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

R. Clinton Schulze Stadium Replacement

Rodeo Dr., Mason, TX, 76856

Target date passed (May 2026)Review Complete

R. Clinton Schulze Stadium Replacement is a renovation/alteration project at Rodeo Dr., Mason, in Mason County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish May 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $3.5M across about 4,850 sq ft.

Estimated project value
$3.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,850 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$722/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 9, 2025248 days across supplied datesMay 15, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    118 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    130 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76856 (Mason)

One email per change. Unsubscribe in one click. Privacy.

R. Clinton Schulze Stadium Replacement is a Renovation/Alteration project located at Rodeo Dr. in Mason, Texas. The project has an estimated value of $3.5M covering 4,850 sq ft. City of Mason is the property owner and ORLO Forensics is the design firm of record. The project was registered with TDLR on September 9, 2025.

Frequently Asked Questions

What is R. Clinton Schulze Stadium Replacement?

R. Clinton Schulze Stadium Replacement is a renovation/alteration project at Rodeo Dr. in Mason, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: North bleacher replacement and associated concrete and earthwork.

Is R. Clinton Schulze Stadium Replacement open in Mason?

R. Clinton Schulze Stadium Replacement was scheduled to finish construction in May 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is R. Clinton Schulze Stadium Replacement located?

R. Clinton Schulze Stadium Replacement is located at Rodeo Dr., Mason, TX, 76856, in Mason County.

Who is the owner or developer of R. Clinton Schulze Stadium Replacement?

City of Mason is the property owner/developer of record for R. Clinton Schulze Stadium Replacement, per its TDLR project registration.

Who is the architect or design firm for R. Clinton Schulze Stadium Replacement?

ORLO Forensics is the design firm of record for R. Clinton Schulze Stadium Replacement, according to its TDLR filing.

How much does R. Clinton Schulze Stadium Replacement cost and how big is it?

R. Clinton Schulze Stadium Replacement has an estimated construction value of $3.5M and approximately 4,850 square feet (about $722/sqft), based on its TDLR filing.

Scope of Work

North bleacher replacement and associated concrete and earthwork.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Rodeo Dr., Mason, TX, 76856

30.73786, -99.20885

Watch all construction in 76856 (Mason)