New GIS Building for South Padre Substation No. 1057 is a new construction project at 28996 State Park Rd 100, South Padre Island, in Cameron County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $12.2M across about 11,110 sq ft.
Design review complete, construction may proceed
New GIS Building for South Padre Substation No. 1057 is a New Construction project located at 28996 State Park Rd 100, South Padre Island, TX 78597 in South Padre Island, Texas. The project has an estimated value of $12.2M covering 11,110 sq ft. AEP Texas Central Company (AEP) is the property owner and Duplantis Design Group, P.C. (DDG) is the design firm of record. The project was registered with TDLR on September 10, 2025.
New GIS Building for South Padre Substation No. 1057 is a new construction project at 28996 State Park Rd 100 in South Padre Island, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project generally consist of a new 11,110 sf Gas Insulated Switch Station (GIS) building that will house GIS switch gear, transformers, batteries, and associated controls. The building will be constructed of pre-cast concrete panels.
New GIS Building for South Padre Substation No. 1057 is currently under construction in South Padre Island, TX. Its current TDLR status is "Review Complete".
New GIS Building for South Padre Substation No. 1057 is located at 28996 State Park Rd 100, South Padre Island, TX, 78597, in Cameron County.
AEP Texas Central Company (AEP) is the property owner/developer of record for New GIS Building for South Padre Substation No. 1057, per its TDLR project registration.
Duplantis Design Group, P.C. (DDG) is the design firm of record for New GIS Building for South Padre Substation No. 1057, according to its TDLR filing.
New GIS Building for South Padre Substation No. 1057 has an estimated construction value of $12.2M and approximately 11,110 square feet (about $1.10K/sqft), based on its TDLR filing.
The project generally consist of a new 11,110 sf Gas Insulated Switch Station (GIS) building that will house GIS switch gear, transformers, batteries, and associated controls. The building will be constructed of pre-cast concrete panels.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 10, 2025
Review Complete
Sep 10, 2025
Inspection Complete
Closed