Lake Nasworthy Boat Ramp Replacements Phase 2

Lake Nasworthy, San Angelo, TX, 76904

Opening ~Mar 2027Review Complete

Lake Nasworthy Boat Ramp Replacements Phase 2 is a new construction project at Lake Nasworthy, San Angelo, in Tom Green County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $4.0M across about 103,700 sq ft.

Estimated project value
$4.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
103,700 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$39/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 11, 2025536 days across supplied datesMar 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    171 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76904 (San Angelo)

One email per change. Unsubscribe in one click. Privacy.

Lake Nasworthy Boat Ramp Replacements Phase 2 is a New Construction project located at Lake Nasworthy, San Angelo, TX 76904 in San Angelo, Texas. The project has an estimated value of $4.0M covering 103,700 sq ft. City of San Angelo is the property owner and Freese and Nichols, Inc. is the design firm of record. The project was registered with TDLR on September 11, 2025.

Frequently Asked Questions

What is Lake Nasworthy Boat Ramp Replacements Phase 2?

Lake Nasworthy Boat Ramp Replacements Phase 2 is a new construction project at Lake Nasworthy in San Angelo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: boat ramp replacements and associated parking facilities 103,700sf

Is Lake Nasworthy Boat Ramp Replacements Phase 2 open in San Angelo?

Lake Nasworthy Boat Ramp Replacements Phase 2 is still under construction in San Angelo, TX, with an estimated completion of Mar 2027 according to its TDLR registration.

Where is Lake Nasworthy Boat Ramp Replacements Phase 2 located?

Lake Nasworthy Boat Ramp Replacements Phase 2 is located at Lake Nasworthy, San Angelo, TX, 76904, in Tom Green County.

Who is the owner or developer of Lake Nasworthy Boat Ramp Replacements Phase 2?

City of San Angelo is the property owner/developer of record for Lake Nasworthy Boat Ramp Replacements Phase 2, per its TDLR project registration.

Who is the architect or design firm for Lake Nasworthy Boat Ramp Replacements Phase 2?

Freese and Nichols, Inc. is the design firm of record for Lake Nasworthy Boat Ramp Replacements Phase 2, according to its TDLR filing.

How much does Lake Nasworthy Boat Ramp Replacements Phase 2 cost and how big is it?

Lake Nasworthy Boat Ramp Replacements Phase 2 has an estimated construction value of $4.0M and approximately 103,700 square feet (about $39/sqft), based on its TDLR filing.

Scope of Work

boat ramp replacements and associated parking facilities 103,700sf

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Lake Nasworthy, San Angelo, TX, 76904

Location by street address

Watch all construction in 76904 (San Angelo)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Angelo?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.