Vape Shop
Vape Shop is a renovation/alteration project at 1712 Frankford Rd, Suite 106, Carrollton, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $135K across about 1,808 sq ft.
๐Project Metrics
TDLR #TABS2026000707Review Complete
Design review complete, construction may proceed
Vape Shop is a Renovation/Alteration project located at 1712 Frankford Rd, Suite 106, Carrollton, TX 75007 in Carrollton, Texas. The project has an estimated value of $135K covering 1,808 sq ft. Texas Mart Associates LLC is the property owner and Jim Hill Designs is the design firm of record. The project was registered with TDLR on September 11, 2025.
โFrequently Asked Questions
What is Vape Shop?
Vape Shop is a renovation/alteration project at 1712 Frankford Rd, Suite 106 in Carrollton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1,808 square feet remodel existing veterinary clinic into smaller retail space.
Is Vape Shop open in Carrollton?
Vape Shop is currently under construction in Carrollton, TX. Its current TDLR status is "Review Complete".
Where is Vape Shop located?
Vape Shop is located at 1712 Frankford Rd, Suite 106, Carrollton, TX, 75007, in Denton County.
Who is the owner or developer of Vape Shop?
Texas Mart Associates LLC is the property owner/developer of record for Vape Shop, per its TDLR project registration.
Who is the architect or design firm for Vape Shop?
Jim Hill Designs is the design firm of record for Vape Shop, according to its TDLR filing.
How much does Vape Shop cost and how big is it?
Vape Shop has an estimated construction value of $135K and approximately 1,808 square feet (about $75/sqft), based on its TDLR filing.
๐Scope of Work
1,808 square feet remodel existing veterinary clinic into smaller retail space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 11, 2025
Review Complete
Sep 11, 2025
Inspection Complete
Closed