Spec Space
Spec Space is a renovation/alteration project at 1712 Frankford Rd, Carrollton, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $165K across about 1,808 sq ft.
๐Project Metrics
TDLR #TABS2026003256Review Complete
Design review complete, construction may proceed
Spec Space is a Renovation/Alteration project located at 1712 Frankford Rd, Carrollton, TX 75007 in Carrollton, Texas. The project has an estimated value of $165K covering 1,808 sq ft. Texas Mart Associates LLC is the property owner and Jim Hill Designs is the design firm of record. The project was registered with TDLR on October 13, 2025.
โFrequently Asked Questions
What is Spec Space?
Spec Space is a renovation/alteration project at 1712 Frankford Rd in Carrollton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel existing space
Is Spec Space open in Carrollton?
Spec Space is currently under construction in Carrollton, TX. Its current TDLR status is "Review Complete".
Where is Spec Space located?
Spec Space is located at 1712 Frankford Rd, Carrollton, TX, 75007, in Denton County.
Who is the owner or developer of Spec Space?
Texas Mart Associates LLC is the property owner/developer of record for Spec Space, per its TDLR project registration.
Who is the architect or design firm for Spec Space?
Jim Hill Designs is the design firm of record for Spec Space, according to its TDLR filing.
How much does Spec Space cost and how big is it?
Spec Space has an estimated construction value of $165K and approximately 1,808 square feet (about $91/sqft), based on its TDLR filing.
๐Scope of Work
Remodel existing space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 13, 2025
Review Complete
Oct 13, 2025
Inspection Complete
Closed